Search results

Jump to navigation Jump to search
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti * Marshall Mixtures – Subsection 4: Comment added “2C Designs require 7000g of mixture at optimum”; plus
    4 KB (560 words) - 15:14, 19 June 2017
  • ...nician certification or similarly titled certifications expire after four (4) years unless stated otherwise. [[Category:Division 1]]
    2 KB (220 words) - 10:30, 11 May 2021
  • ...rocedures (effective for all projects let between October 6, 2017 and June 4, 2020)] [[Category:Division 1]]
    2 KB (302 words) - 15:34, 6 May 2021
  • ...course for each lane, over the centerline rumbles essentially filling them 4 times. [[Category:Division 5]]
    1 KB (192 words) - 16:30, 6 May 2021
  • ::[[File:Mandrel Testing - 9 Point - 4.jpg|border|left|500px]] [[Category:Division 4]]
    5 KB (826 words) - 16:06, 6 May 2021
  • :4. Contractors are responsible for following all the subcontract requirements ...s/GetDocument.htm?fileName=0178.pdf Form 0178]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.
    7 KB (1,019 words) - 12:47, 18 March 2020
  • <b>Chapter 4 (Supplier Qualification Program):</b> The Structural Fabrication Unit’s S [[Category:Division 1]]
    3 KB (398 words) - 13:08, 4 August 2020
  • See [[501 - HMA Mixtures|Division 5, HMA]] and [[601 - PCC Pavement Mixtures|Division 6, Concrete]] for general materials requirements. Review the plans and [ht ...l be checked using a 10 foot (3 m) straightedge. Variation of more than 1/4 inch in 10 feet (6 mm in 3 m) must be remedied.
    4 KB (561 words) - 12:51, 24 July 2013
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    40 KB (5,035 words) - 11:47, 26 August 2025
  • <gallery widths=200 heights=50 perrow=4 caption="MENU"> <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center>
    28 KB (3,729 words) - 12:17, 23 April 2019
  • <div id="701.03.A.4"></div> ::'''4.''' Concrete temperature requirement of subsection [[Section 601 - Portla
    12 KB (1,594 words) - 15:56, 26 July 2013
  • ...ed of reinforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickne ...e paid for as separate pay items as described in [[401 - Culverts|Division 4,]] Drainage Features.
    5 KB (721 words) - 12:40, 24 July 2013
  • :4. Major Subcontractors^^ [[Category:Division 1]]
    7 KB (1,055 words) - 11:29, 14 July 2020
  • Face forms are supported from the back form by use of division plates. See '''''Figure 802-3'''''. In addition to supporting the face fo [[File:Figure 802-3.JPG|center|thumb|600px|Figure 802-3 - Curb and Gutter Division Plates]]
    12 KB (1,933 words) - 12:44, 24 July 2013
  • !Updated!! Division !! Section !! Summary !! What Changed |<center>4/28/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engi
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...perations Environmental Engineer or the Supervising Engineer of the Design Division’s Utilities Drainage and Roadsides Section. ...receipt of the claim in accordance with the Act (ref: MCL 691.1416 Sec 19(4)). It is not necessary to wait until an actual claim is received to make t
    20 KB (3,054 words) - 14:47, 19 June 2017
  • ...ned and field coated with a similar three-coat system, referred to as Type 4. The following guidelines should be strictly followed in inspecting these The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th
    33 KB (4,812 words) - 17:54, 9 February 2021
  • * 4-foot level [[Category:Division 2]]
    6 KB (868 words) - 13:29, 15 October 2025
  • ...ase must be crushed with the HMA pavement. No particle sizes should exceed 4 inches in the largest dimension after crushing with 95% of the particles ha * 4-foot level
    17 KB (2,558 words) - 14:48, 13 October 2025
  • .../project engineer is notified of all commitments by the Contracts Services Division (CSD). The email notification includes all DBE commitment specifics and whe 4. DBEs must pay the refineries with their own funds. The prime is not to p
    27 KB (4,093 words) - 09:49, 23 April 2020

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)