Uploads by Jhudson-fishbeck
Jump to navigation
Jump to search
This special page shows all uploaded files.
| Date | Name | Thumbnail | Size | Description | Versions |
|---|---|---|---|---|---|
| 14:46, 14 October 2025 | 405 (19).jpg (file) | 89 KB | Trench Boxes | 1 | |
| 14:44, 14 October 2025 | 405 (18).jpg (file) | 387 KB | Sheet Piling (cold rolled) | 1 | |
| 14:42, 14 October 2025 | 405 (17).jpg (file) | 77 KB | Stone/Sand Box | 1 | |
| 14:41, 14 October 2025 | 405 (16).jpg (file) | 78 KB | Trench Box | 1 | |
| 14:20, 14 October 2025 | 405 (7).jpg (file) | 155 KB | Rubber Tired Crane | 1 | |
| 11:53, 14 October 2025 | 405 (1).jpg (file) | 128 KB | 1 | ||
| 09:50, 22 August 2025 | 406 (27).jpg (file) | 92 KB | Geotextile Separator | 1 | |
| 09:49, 22 August 2025 | 406 (26).jpg (file) | 58 KB | Geotextile Tags | 1 | |
| 09:40, 22 August 2025 | 406 (25).jpg (file) | 76 KB | Steel Reinforcement Collar Closure Pour | 1 | |
| 09:39, 22 August 2025 | 406 (24).jpg (file) | 168 KB | Steel Reinforcement for an Apron | 1 | |
| 09:37, 22 August 2025 | 406 (23).jpg (file) | 120 KB | 1 | ||
| 09:37, 22 August 2025 | 406 (22).jpg (file) | 122 KB | Joint Tie Assembly | 1 | |
| 09:36, 22 August 2025 | 406 (21).jpg (file) | 183 KB | Joint Sealer | 1 | |
| 09:35, 22 August 2025 | 406 (20).jpg (file) | 178 KB | Tongue & Groove Joint | 1 | |
| 09:34, 22 August 2025 | 406 (19).jpg (file) | 207 KB | Box Culvert Joint | 1 | |
| 09:33, 22 August 2025 | 406 (18).jpg (file) | 116 KB | Box Culvert | 1 | |
| 09:31, 22 August 2025 | 406-Bypass.jpg (file) | 229 KB | Bypass Pumping Operations | 1 | |
| 09:29, 22 August 2025 | 406 (16).jpg (file) | 236 KB | Bypass Pumping Operations | 1 | |
| 09:27, 22 August 2025 | 406 (15).jpg (file) | 151 KB | Dewatering Operations | 1 | |
| 21:08, 21 August 2025 | 406 (3).jpg (file) | 109 KB | Spalled Precast Box Culvert to be Rejected | 1 | |
| 20:21, 21 August 2025 | 406 (2).jpg (file) | 83 KB | Chipped Precast Unit to be Rejected | 1 | |
| 19:55, 21 August 2025 | 406 (1).jpg (file) | 113 KB | Arch Culvert | 1 | |
| 19:34, 21 August 2025 | 404 (12).jpg (file) | 314 KB | Underdrain Outlet Tapped into a Drainage Structure | 1 | |
| 19:33, 21 August 2025 | 404 (11).jpg (file) | 174 KB | PVC Outlet for Subbase Underdrain | 1 | |
| 19:28, 21 August 2025 | 404 (10).jpg (file) | 554 KB | 34R Backfill Place in the Open-Graded Underdrain Tench | 1 | |
| 19:26, 21 August 2025 | 404 (9).jpg (file) | 580 KB | Open-Graded Pipe in the Lined Trench | 1 | |
| 19:25, 21 August 2025 | 404 (8).jpg (file) | 129 KB | Subbase Underdrain Pipe Installed in Trench | 1 | |
| 19:23, 21 August 2025 | 404 (7).jpg (file) | 31 KB | Sample Plan Sheet indicating Outlet Locations | 1 | |
| 19:15, 21 August 2025 | Pipe trencher.jpg (file) | 350 KB | Pipe Trencher Installing Underdrain | 1 | |
| 19:12, 21 August 2025 | 404 (5).jpg (file) | 114 KB | Dump Truck, Bulldozer, and Skid Steer Installing Subbase Underdrain and Subbase | 1 | |
| 19:09, 21 August 2025 | 404 (4).jpg (file) | 54 KB | Underdrain Pipe Both Wrapped and Unwrapped | 1 | |
| 19:08, 21 August 2025 | 404 (3).jpg (file) | 310 KB | Underdrain Outlet End Section with Grate | 1 | |
| 12:55, 21 August 2025 | 403 (1).jpg (file) | 92 KB | Density Testing Backfill Around a Drainage Structure | 1 | |
| 12:53, 21 August 2025 | 403 (19).jpg (file) | 179 KB | Paint Marks used to Determine Backfill Height | 1 | |
| 11:44, 21 August 2025 | 403 (18).jpg (file) | 86 KB | Tags on Geosynthetic Materials | 1 | |
| 11:24, 21 August 2025 | 403 (17).jpg (file) | 117 KB | Tapping into a Drainage Structure | 1 | |
| 16:27, 20 August 2025 | 403 (14).jpg (file) | 142 KB | Placement of Precast Drainage Structures | 1 | |
| 16:24, 20 August 2025 | 403 (12).jpg (file) | 192 KB | Construction of a Block Drainage Structure | 1 | |
| 16:23, 20 August 2025 | 403 (11).jpg (file) | 221 KB | Coring a Storm Sewer Pipe to Install a Structure on Top of the Pipe | 1 | |
| 16:22, 20 August 2025 | 403 (10).jpg (file) | 292 KB | Placing a Precast Drainage Structure Unit | 1 | |
| 16:16, 20 August 2025 | 204-026.jpg (file) | 16 KB | Density Testing on Compacted Sand Backfill | 1 | |
| 16:14, 20 August 2025 | 204-024.jpg (file) | 13 KB | Excavators Demolishing a Box Culvert | 1 | |
| 16:13, 20 August 2025 | 204-022.jpg (file) | 14 KB | Excavator with Breaker Demolishing a Bridge Abutment | 1 | |
| 16:12, 20 August 2025 | 204-020.jpg (file) | 12 KB | Excavator Removing Concrete Pavement Broken by a Guillotine Breaker | 1 | |
| 16:11, 20 August 2025 | 204-018.jpg (file) | 9 KB | Excavator Removing Concrete Pavement Over a Culvert | 1 | |
| 16:08, 20 August 2025 | 204-016.jpg (file) | 12 KB | Excavator with Breaker Attachment | 1 | |
| 16:07, 20 August 2025 | 204-010.jpg (file) | 14 KB | Guillotine Breaker | 1 | |
| 16:02, 20 August 2025 | 203-034.jpg (file) | 20 KB | Concrete Brick and Type I Cement for Bulkhead | 1 | |
| 16:02, 20 August 2025 | 203-032.jpg (file) | 10 KB | Existing Sewer Pipe Connection to New Structure | 1 | |
| 16:00, 20 August 2025 | 203-030.jpg (file) | 26 KB | Removed Items Ready for Disposal | 1 |