Category:Construction Manual
Jump to navigation
Jump to search
(previous page) (next page)
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Construction Manual
Pages in category "Construction Manual"
The following 200 pages are in this category, out of 218 total.
(previous page) (next page)1
- 101 - Terms, Format, and Conditions
- 102.01 Prequalification of Bidders
- 102.02 Contents of Proposal - Progress Clause
- 102.03 Interpretation of Bid Items in the Proposal
- 102.04 Examination of Plans, Specifications, and Work Site
- 102.05 Preparation of Bid Items in the Proposal
- 102.06 Irregular Bids
- 102.07 Delivery of Bid
- 102.08 Withdrawal or Revision of Bid
- 102.09 Downloading of Bids
- 102.10 Bid Review
- 102.11 Bid Rejection
- 102.12 Bid Rejection Appeal
- 102.13 Consideration of Bids
- 102.15 Execution and Award of Contract
- 102.16 Requirements of Contract Bonds
- 102.17 Bid Guaranty Payment
- 102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
- 103.01 Intent of the Contract
- 103.02 Contract Revisions
- 103.03 Contractor Engineer Communication
- 104.01 Authority of the Department
- 104.02 Plans and Working Drawings
- 104.03 Deviations from the Plans
- 104.04 Conformity with the Contrat
- 104.05 Removal of Unauthorized Work
- 104.06 Coordination of Drawing Dimensions and Contract Documentation
- 104.07 Contractor Obligations
- 104.08 Cooperation by the Contractor
- 104.09 Lines, Grades, and Elevations
- 104.10 Contractor Claim for Extra Compensation or Time Extension
- 104.11 Work Zone Safety and Mobility
- 104.12 Approval for Use of the Right of Way
- 105.01 Quality and Scope of Supply
- 105.02 Natural Material Sources Found Within the Excavation Limits
- 105.03 Borrow Materials
- 105.04 Miscellameous Quantities
- 105.05 Approval of Materials Incorporated into the Work
- 105.06 Storage of Materials
- 105.07 Handling and Transporting Materials
- 105.08 Nonconforming Materials
- 105.09 Materials not Incorporated into the Work
- 105.10 Buy America Source of Steel and Iron
- 106 - Quality Assurance Acceptance Program
- 107.01 Laws to be Observed
- 107.02 Permits and Licenses
- 107.03 Patented Process and Materials
- 107.04 Federal Aid Participation
- 107.05 Sanitary Provisions
- 107.06 Furnishing Right-of-Way
- 107.07 Protection and Restoration of Property
- 107.08 Land Monuments and Property Corners
- 107.09 Archeological and Historical Findings
- 107.10 Indemnification, Damage Liability, and Insurance
- 107.11 Contractor's Responsibility for the Work
- 107.12 Contractor's Responsibility for Utility Property and Services
- 107.13 Personal Liability of Public Officials
- 107.14 No Waiver of Legal Rights
- 107.15 Compliance with Laws; Environmental Protection
- 107.16 Forest Protection
- 107.17 Use of Explosives
- 107.18 Work over Navigable Waters
- 107.19 Hauling on Local Roads and Streets
- 107.20 Private Railroad Crossing for Haul Purposes
- 107.21 Open to Traffic
- 108.01 Subcontracting of Contract Work
- 108.02 Limitations of Operations
- 108.03 Competence of Workers
- 108.04 Adequacy of Methods and Equipment
- 108.05 Progress Schedule
- 108.06 Determination of Contract Time for Work Day Contracts
- 108.07 Extension of Time on Work Day Contracts
- 108.08 Extension of Time on Calendar Day Contracts
- 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
- 108.10 Liquidated Damages
- 108.11 Default of Contract
- 108.12 Termination of Contract
- 109.01 Measurement of Quantities
- 109.02 Scope of Payment
- 109.03 Payments for Increased or Decreased Quantities
- 109.04 Progress and Partial Payments
- 109.05 Payment for Contract Revisions
- 109.06 Source of Supply and Carrier Rates on Materials
- 109.07 Final Inspection, Acceptance, and Final Payment
- 109.08 Prompt Payment
- 150 - Mobilization
2
- 201 - Clearing
- 202 - Removing Trees, Stumps, and Corduroy
- 203 - Removing Drainage Structures, Culverts, and Sewers
- 204 - Removing Miscellaneous Structures and Materials
- 205 - Roadway Earthwork
- 206 - Excavation and Backfill for Structures
- 207 - Obliterating Roadway
- 208 - Soil Erosion and Sedimentation Control (NPDES)
- 209 - Project Cleanup
3
4
5
6
7
- 700 - Closure of Unsafe Structures
- 701 - Portland Cement Concrete for Structures
- 701-Portland Cement Concrete for Structures
- 702 - Mortar and Grout
- 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
- 704 - Steel Sheet Piling and Cofferdams
- 705 - Foundation Piling
- 706 - Structural Concrete
- 707 - Structural Steel
- 708 - Prestressed Concrete
- 709 - Timber Sturctures
- 710 - Waterproofing and Protective Covers
- 711 - Bridge Railings
- 712 - Bridge Rehabilitation, Concrete
- 713 - Bridge Rehabilitation, Steel
- 714 - Temporary Structures and Approaches
- 715 - Cleaning and Coating Existing Structural Steel
- 716 - Shop Cleaning and Coating Structural Steel
- 717 - Downspouts and Drains
- 718 - Drilled Shafts
- 719 - Earth Retaining Structures
8
- 801 - Concrete Driveways
- 802 - Concrete Curb, Gutter, and Dividers
- 803 - Concrete Sidewalk, Ramps, and Steps
- 804 - Concrete Barriers and Glare Screens
- 805 - Hot Mix Asphalt Curb
- 806 - Bicycle Paths
- 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts
- 808 - Fencing
- 809 - Field Office
- 810 - Permanent Traffic Signs and Supports
- 811 - Permanent Pavement Markings
- 812 - Temporary Traffic Control for Construction Zone Operations
- 813 - Slope Protection
- 814 - Paved Ditches
- 815 - Landscaping
- 816 - Turf Establishment
- 817 - Landscape Mowing
- 818 - Dune Grass Planting
- 819 - Electrical and Lighting
- 820 - Traffic Signals
- 821 - Preservation of Land Monuments and Property Corners
- 822 - Ground or Cut Centerline and Shoulder Corrugations
- 823 - Water Mains
- 824 - Contractor Staking
C
- Certified Engineer Process
- Certified Office Technician Process
- Commentary - Special Provision for Quality Control and Acceptance of Portland Cement Concrete 12SP604(B)
- Construction Field Services Indirect Testing Charges
- Construction Value Engineering Change Proposal (VECP)
- Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects
- Contract Administration and Oversight Guidelines for Projects Containing Warranty Work
- Contractor's Equipment and Traffic Control