Search results
Jump to navigation
Jump to search
- [[Category:New CM Format]]6 KB (868 words) - 13:29, 15 October 2025
- ==[[#Wiki Navigation Videos|Wiki Navigation Videos <font color="red"> '''- NEW !!'''</font>]]== ==[[#Sign Up for UPDATES|Sign Up for Updates <font color="red"> '''- NEW !!'''</font>]]==28 KB (3,729 words) - 12:17, 23 April 2019
- ...maintain sewer service during construction. To ensure minimal disruption, new sewer may be constructed before or in conjunction with work on the existing ...ortion of existing sewer necessary to allow the required connection to the new work. If damages are incurred to the existing sewer to remain in place, the15 KB (2,154 words) - 13:12, 15 October 2025
- ...nstruction waste. These materials are processed and reused as aggregate in new construction projects, minimizing waste and reducing the need for virgin ma ...removed from the site. Once the material has been graded and compacted, a new HMA pavement is placed on top.17 KB (2,558 words) - 14:48, 13 October 2025
- ...endering unusable road sections (concrete or asphalt) that lie outside the new construction limits. This may include filling ditches, grading operations t Fertilizers provide the necessary nutrients to support growth of new vegetation. Refer to [https://mdotwiki.state.mi.us/images_construction/9/9521 KB (2,895 words) - 13:24, 15 October 2025
- ...orizontal length. Existing subbase left in place will be transitioned with new sand subbase material to avoid differential frost heave. [[Category:New CM Format]]14 KB (2,047 words) - 13:30, 15 October 2025
- ...lder to a defined width and depth in preparation for the installation of a new shoulder. ...der must be scarified to a minimum depth of 2 inches prior to placement of new material. The compacted aggregate should be maintained flush with the exist24 KB (3,581 words) - 14:46, 13 October 2025
- For every new source, new day, or suspected change in material, a moisture check needs to be complete [[Category:New CM Format]]18 KB (2,661 words) - 14:47, 13 October 2025
- ...ss than 3 inches of material will be placed, the Contractor must blend the new material with the existing aggregate base so 6 inches of material will be c For every new source, new day, or suspected change in material, a moisture check needs to be complete20 KB (2,979 words) - 13:31, 15 October 2025
- ...of existing concrete, providing a suitable base for the construction of a new asphalt overlay. Rubblizing is chosen for its cost-effectiveness, reduced c # Check construction of new drainage systems, including outlet endings, is complete and functional. Bac18 KB (2,604 words) - 13:35, 15 October 2025
- [[Category:New CM Format]]14 KB (2,054 words) - 13:01, 15 October 2025
- [[Category:New CM Format]]15 KB (2,142 words) - 14:44, 13 October 2025
- ...ome cases, existing functional infrastructure might be extended to fit the new design. ...remove portions of existing miscellaneous structures not interfering with new construction to at least 3 feet below the pavement surface within the limit26 KB (3,746 words) - 13:16, 15 October 2025
- ...ate consolidation. If the Contractor changes the source of the material, a new control strip is required. Control strip requirements include: ...ny of the following occurs during construction of the open-graded layer, a new test strip will be required:21 KB (3,177 words) - 13:33, 15 October 2025
- For every new source, new day, or suspected change in material, a moisture check needs to be complete [[Category:New CM Format]]22 KB (3,225 words) - 13:22, 15 October 2025
- [[Category:New CM Format]]16 KB (2,386 words) - 17:04, 14 July 2026
- ...ill, often comprised of sand, is used to fill the space around existing or new features and the existing ground. Refer to [https://mdotwiki.state.mi.us/im ...actor will provide and install new covers, including frames and grates, on new or existing structures as called for in the plans. Castings are to be set o35 KB (5,019 words) - 13:50, 15 October 2025
- For every new source, new day, or suspected change in material, a moisture check needs to be complete [[Category:New CM Format]]29 KB (4,339 words) - 13:52, 15 October 2025
- ...e safety of workers as they perform work to install the foundation for the new culvert. The extent of excavation can be reviewed within the plans. ...eosynthetic material provides separation between existing material and the new culvert bedding. Refer to the plans for the geosynthetic material required35 KB (5,052 words) - 14:02, 15 October 2025
- ...ill, often comprised of sand, is used to fill the space around existing or new features and the existing ground. Refer to [https://mdotwiki.state.mi.us/im * '''For small pump stations''', the excavator may dig the hole for the new pump station, place the precast components, lower the pumps in place, and b50 KB (7,467 words) - 14:33, 15 October 2025