Search results
Jump to navigation
Jump to search
- ...nician certification or similarly titled certifications expire after four (4) years unless stated otherwise. [[Category:Division 1]]2 KB (220 words) - 10:30, 11 May 2021
- ...rocedures (effective for all projects let between October 6, 2017 and June 4, 2020)] [[Category:Division 1]]2 KB (302 words) - 15:34, 6 May 2021
- The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti * Marshall Mixtures – Subsection 4: Comment added “2C Designs require 7000g of mixture at optimum”; plus4 KB (560 words) - 15:14, 19 June 2017
- <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed40 KB (5,035 words) - 11:47, 26 August 2025
- <gallery widths=200 heights=50 perrow=4 caption="MENU"> <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center>28 KB (3,729 words) - 12:17, 23 April 2019
- ::[[File:Mandrel Testing - 9 Point - 4.jpg|border|left|500px]] [[Category:Division 4]]5 KB (826 words) - 16:06, 6 May 2021
- !Updated!! Division !! Section !! Summary !! What Changed |<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Interim_File_Review|Interim File Review]]</center>||Cre16 KB (2,430 words) - 15:46, 6 May 2021
- :4. Major Subcontractors^^ [[Category:Division 1]]7 KB (1,055 words) - 11:29, 14 July 2020
- <div id="701.03.A.4"></div> ::'''4.''' Concrete temperature requirement of subsection [[Section 601 - Portla12 KB (1,594 words) - 15:56, 26 July 2013
- These contractor requirements are supplemental to all other required contract provisions. * Supplemental unemployment benefit programs53 KB (8,077 words) - 14:27, 30 March 2020
- ...placing a concrete mixture of portland cement, blended portland cement, supplemental cementitious materials, fine aggregate, coarse aggregate, water, and admi ...s (including water meters) in accordance with Item 2.5.3 and Item 2.5.4 of the NRMCA checklist, or other Department-approved program requirement36 KB (5,128 words) - 09:44, 29 July 2013
- The Office of Business Development (OBD) has developed a supplemental guide to assist construction staff in the monitoring of CUF activitie .../project engineer is notified of all commitments by the Contracts Services Division (CSD). The email notification includes all DBE commitment specifics and whe27 KB (4,093 words) - 09:49, 23 April 2020
- <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...Bridge Decks Concrete Depth Measurements, for all bridge deck pours. See Division 706 of the Construction Manual for a sample form and instructions. Concret33 KB (4,927 words) - 10:17, 3 May 2021
- ...ersight (S&O) Agreement] detailing the arrangement between FHWA’s Michigan Division and MDOT regarding agency roles and responsibilities with respect to federa ...d forward the contract modification and letter to the Financial Operations Division.30 KB (4,194 words) - 15:49, 6 May 2021
- * Other applicable supplemental specifications. ...er in good condition that is at least 6 inches in diameter and is at least 4.5 feet above the base of the tree from ground level is considered marketabl16 KB (2,386 words) - 17:04, 14 July 2026
- ...ed and graded to the proper alignment and grade, leaving room for at least 4 inches of granular material as a bedding layer below the pipe. The bedding ...tion]. Storm sewer bedding must be constructed uncompacted using a minimum 4-inch layer of granular Class III or IIIA material in accordance with the de40 KB (6,148 words) - 15:12, 10 December 2025
- ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the ...s/construction/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as53 KB (7,171 words) - 15:35, 6 May 2021
- ...ed and graded to the proper alignment and grade, leaving room for at least 4 inches of granular material as a bedding layer below the pipe. The bedding ...| [[File:401-029.jpg|200px|thumb|center|'''Installation Procedure for Type 4 Gaskets (Source: Press-Seal Corporation)''']]44 KB (6,740 words) - 13:39, 15 October 2025
- ::* Supplemental unemployment benefit programs ...the contractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist.62 KB (9,393 words) - 09:38, 8 June 2021
- ...hand chipping involves chipping to ¾” below top mat or more (approximately 4” to full depth). This type of patch may be repaired with the LMC; however ...heir original bar diameter is supplemented with additional reinforcement. Supplemental steel reinforcement should be lapped with the existing deck steel for a dis84 KB (13,316 words) - 17:17, 9 February 2021