File list

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size User Description Versions
17:02, 14 July 2026 Test IMG 1544.PNG (file) 3.29 MB Clarkj25   1
16:59, 14 July 2026 FNew Holland 757 C backhoe attachment 32 5a9fa0de98ef6.jpg (file) 61 KB Clarkj25   1
16:55, 14 July 2026 Final Barn.jpg (file) 117 KB Clarkj25   1
14:46, 14 October 2025 405 (19).jpg (file) 89 KB Jhudson-fishbeck Trench Boxes 1
14:44, 14 October 2025 405 (18).jpg (file) 387 KB Jhudson-fishbeck Sheet Piling (cold rolled) 1
14:42, 14 October 2025 405 (17).jpg (file) 77 KB Jhudson-fishbeck Stone/Sand Box 1
14:41, 14 October 2025 405 (16).jpg (file) 78 KB Jhudson-fishbeck Trench Box 1
14:20, 14 October 2025 405 (7).jpg (file) 155 KB Jhudson-fishbeck Rubber Tired Crane 1
11:53, 14 October 2025 405 (1).jpg (file) 128 KB Jhudson-fishbeck   1
11:03, 25 August 2025 300px-SESC Pocket Guide.png (file) 217 KB Clarkj25   1
09:50, 22 August 2025 406 (27).jpg (file) 92 KB Jhudson-fishbeck Geotextile Separator 1
09:49, 22 August 2025 406 (26).jpg (file) 58 KB Jhudson-fishbeck Geotextile Tags 1
09:40, 22 August 2025 406 (25).jpg (file) 76 KB Jhudson-fishbeck Steel Reinforcement Collar Closure Pour 1
09:39, 22 August 2025 406 (24).jpg (file) 168 KB Jhudson-fishbeck Steel Reinforcement for an Apron 1
09:37, 22 August 2025 406 (23).jpg (file) 120 KB Jhudson-fishbeck   1
09:37, 22 August 2025 406 (22).jpg (file) 122 KB Jhudson-fishbeck Joint Tie Assembly 1
09:36, 22 August 2025 406 (21).jpg (file) 183 KB Jhudson-fishbeck Joint Sealer 1
09:35, 22 August 2025 406 (20).jpg (file) 178 KB Jhudson-fishbeck Tongue & Groove Joint 1
09:34, 22 August 2025 406 (19).jpg (file) 207 KB Jhudson-fishbeck Box Culvert Joint 1
09:33, 22 August 2025 406 (18).jpg (file) 116 KB Jhudson-fishbeck Box Culvert 1
09:31, 22 August 2025 406-Bypass.jpg (file) 229 KB Jhudson-fishbeck Bypass Pumping Operations 1
09:29, 22 August 2025 406 (16).jpg (file) 236 KB Jhudson-fishbeck Bypass Pumping Operations 1
09:27, 22 August 2025 406 (15).jpg (file) 151 KB Jhudson-fishbeck Dewatering Operations 1
21:08, 21 August 2025 406 (3).jpg (file) 109 KB Jhudson-fishbeck Spalled Precast Box Culvert to be Rejected 1
20:21, 21 August 2025 406 (2).jpg (file) 83 KB Jhudson-fishbeck Chipped Precast Unit to be Rejected 1
19:55, 21 August 2025 406 (1).jpg (file) 113 KB Jhudson-fishbeck Arch Culvert 1
19:34, 21 August 2025 404 (12).jpg (file) 314 KB Jhudson-fishbeck Underdrain Outlet Tapped into a Drainage Structure 1
19:33, 21 August 2025 404 (11).jpg (file) 174 KB Jhudson-fishbeck PVC Outlet for Subbase Underdrain 1
19:28, 21 August 2025 404 (10).jpg (file) 554 KB Jhudson-fishbeck 34R Backfill Place in the Open-Graded Underdrain Tench 1
19:26, 21 August 2025 404 (9).jpg (file) 580 KB Jhudson-fishbeck Open-Graded Pipe in the Lined Trench 1
19:25, 21 August 2025 404 (8).jpg (file) 129 KB Jhudson-fishbeck Subbase Underdrain Pipe Installed in Trench 1
19:23, 21 August 2025 404 (7).jpg (file) 31 KB Jhudson-fishbeck Sample Plan Sheet indicating Outlet Locations 1
19:15, 21 August 2025 Pipe trencher.jpg (file) 350 KB Jhudson-fishbeck Pipe Trencher Installing Underdrain 1
19:12, 21 August 2025 404 (5).jpg (file) 114 KB Jhudson-fishbeck Dump Truck, Bulldozer, and Skid Steer Installing Subbase Underdrain and Subbase 1
19:09, 21 August 2025 404 (4).jpg (file) 54 KB Jhudson-fishbeck Underdrain Pipe Both Wrapped and Unwrapped 1
19:08, 21 August 2025 404 (3).jpg (file) 310 KB Jhudson-fishbeck Underdrain Outlet End Section with Grate 1
12:55, 21 August 2025 403 (1).jpg (file) 92 KB Jhudson-fishbeck Density Testing Backfill Around a Drainage Structure 1
12:53, 21 August 2025 403 (19).jpg (file) 179 KB Jhudson-fishbeck Paint Marks used to Determine Backfill Height 1
11:44, 21 August 2025 403 (18).jpg (file) 86 KB Jhudson-fishbeck Tags on Geosynthetic Materials 1
11:24, 21 August 2025 403 (17).jpg (file) 117 KB Jhudson-fishbeck Tapping into a Drainage Structure 1
16:27, 20 August 2025 403 (14).jpg (file) 142 KB Jhudson-fishbeck Placement of Precast Drainage Structures 1
16:24, 20 August 2025 403 (12).jpg (file) 192 KB Jhudson-fishbeck Construction of a Block Drainage Structure 1
16:23, 20 August 2025 403 (11).jpg (file) 221 KB Jhudson-fishbeck Coring a Storm Sewer Pipe to Install a Structure on Top of the Pipe 1
16:22, 20 August 2025 403 (10).jpg (file) 292 KB Jhudson-fishbeck Placing a Precast Drainage Structure Unit 1
16:16, 20 August 2025 204-026.jpg (file) 16 KB Jhudson-fishbeck Density Testing on Compacted Sand Backfill 1
16:14, 20 August 2025 204-024.jpg (file) 13 KB Jhudson-fishbeck Excavators Demolishing a Box Culvert 1
16:13, 20 August 2025 204-022.jpg (file) 14 KB Jhudson-fishbeck Excavator with Breaker Demolishing a Bridge Abutment 1
16:12, 20 August 2025 204-020.jpg (file) 12 KB Jhudson-fishbeck Excavator Removing Concrete Pavement Broken by a Guillotine Breaker 1
16:11, 20 August 2025 204-018.jpg (file) 9 KB Jhudson-fishbeck Excavator Removing Concrete Pavement Over a Culvert 1
16:08, 20 August 2025 204-016.jpg (file) 12 KB Jhudson-fishbeck Excavator with Breaker Attachment 1
First pagePrevious pageNext pageLast page