File list

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size User Description Versions
12:42, 19 August 2025 307-002.jpg (file) 285 KB Jhudson-fishbeck Road Widener 1
12:38, 19 August 2025 307-003.jpg (file) 235 KB Jhudson-fishbeck Excavator Placing Aggregate Material along Shoulder Edge 1
12:28, 19 August 2025 307-008.jpg (file) 201 KB Jhudson-fishbeck Ensure Contractor Removes Traffic Control Devices Once Maintenance Gravel for Temporary Access Driveway has been Placed 1
12:26, 19 August 2025 306-007.jpg (file) 151 KB Jhudson-fishbeck Maintenance Gravel for Temporary Access Driveway 1
12:22, 19 August 2025 306-003.jpg (file) 497 KB Jhudson-fishbeck Maintenance Gravel Placed for a Temporary Roadway 1
12:19, 19 August 2025 306-001.jpg (file) 304 KB Jhudson-fishbeck 23A Aggregate Surface Course for a Roadway 1
12:15, 19 August 2025 305-018.png (file) 329 KB Jhudson-fishbeck Motor Grader Shaping the Crushed Pavement 1
12:14, 19 August 2025 305-016.jpg (file) 20 KB Jhudson-fishbeck New HMA Placed on Crushed Existing Pavement 1
12:13, 19 August 2025 305-014.jpg (file) 28 KB Jhudson-fishbeck Grading/Shaping of Crushed Pavement 1
12:13, 19 August 2025 305-012.png (file) 228 KB Jhudson-fishbeck Pavement Crushing Operation with Water Truck, Pavement Crusher, and Roller 1
12:11, 19 August 2025 305-010.jpg (file) 29 KB Jhudson-fishbeck Pavement Crushing Operation 1
12:10, 19 August 2025 305-008.png (file) 236 KB Jhudson-fishbeck Roller for Compacting Crushed Pavement 1
12:08, 19 August 2025 305-006.jpg (file) 19 KB Jhudson-fishbeck Pavement Crushing Machine 1
12:08, 19 August 2025 305-004.jpg (file) 36 KB Jhudson-fishbeck Pavement Crushing Machine Rotary Drum 1
12:07, 19 August 2025 305-002.jpg (file) 34 KB Jhudson-fishbeck 21AA Aggregate Pile (Limestone) 1
12:02, 19 August 2025 304-027.png (file) 167 KB Jhudson-fishbeck Spot Check Area 1
11:59, 19 August 2025 304-025.png (file) 189 KB Jhudson-fishbeck Z-Grid Roller Compacting Behind Multi-Impact Hammer 1
11:58, 19 August 2025 304-023.png (file) 209 KB Jhudson-fishbeck Reinforcement Removal 1
11:57, 19 August 2025 304-021.png (file) 207 KB Jhudson-fishbeck Exposed Reinforcement 1
11:56, 19 August 2025 304-019.jpg (file) 102 KB Jhudson-fishbeck Delaminated Reinforcement 1
11:51, 19 August 2025 304-017.jpg (file) 90 KB Jhudson-fishbeck Crush Pavement Behind Multi-Impact Hammer 1
10:57, 19 August 2025 304-015.png (file) 137 KB Jhudson-fishbeck Multi-Impact Hammer Crushing Existing PCC 1
10:55, 19 August 2025 304-013.png (file) 167 KB Jhudson-fishbeck Crushed Pavement Behind Resonant Frequency Breaker Through Patch Material 1
10:54, 19 August 2025 304-011.png (file) 244 KB Jhudson-fishbeck Resonant Frequency Breaker Head 1
10:52, 19 August 2025 304-010.png (file) 156 KB Jhudson-fishbeck Resonant Frequency Breaker Crushing PCC 1
10:46, 19 August 2025 304-008.png (file) 184 KB Jhudson-fishbeck Z-Grid Roller 1
10:44, 19 August 2025 304-006.png (file) 179 KB Jhudson-fishbeck Multi-Impact Hammer 1
10:43, 19 August 2025 304-004.png (file) 176 KB Jhudson-fishbeck Resonant Frequency Breaker 1
10:35, 19 August 2025 304-002.png (file) 203 KB Jhudson-fishbeck Filler Aggregate Placed over Crushed Pavement 1
10:22, 19 August 2025 303-007.jpg (file) 128 KB Jhudson-fishbeck Stockpile of Crushed Aggregate Onsite 1
10:19, 19 August 2025 303-006.png (file) 374 KB Jhudson-fishbeck Rutted Grade Used as a Haul Road for Concrete Trucks 1
10:08, 19 August 2025 303-004.jpg (file) 191 KB Jhudson-fishbeck Open-Graded Aggregate Being Placed on Geofabric Separator 1
10:06, 19 August 2025 303-003.jpg (file) 232 KB Jhudson-fishbeck Open-Graded Aggregate Being Placed on Geofabric Separator 1
10:05, 19 August 2025 303-002.jpg (file) 279 KB Jhudson-fishbeck Bulldozer Placing Open-Graded Aggregate 1
10:04, 19 August 2025 303-001.jpg (file) 348 KB Jhudson-fishbeck 4G Aggregate Placed for Road Base 1
16:22, 18 August 2025 302-007.jpg (file) 174 KB Jhudson-fishbeck Aggregate Base Course Installation on a Sand Subbase 1
16:20, 18 August 2025 302-005.jpg (file) 240 KB Jhudson-fishbeck Grader 1
16:12, 18 August 2025 302-003.jpg (file) 149 KB Jhudson-fishbeck Bulldozer with Equipped AMG Placing Aggregate Base on Subgrade 1
16:10, 18 August 2025 302-002.jpg (file) 146 KB Jhudson-fishbeck Auto Trimmer Equipped with AMG 1
15:06, 18 August 2025 301-016.jpg (file) 16 KB Jhudson-fishbeck Booking Grades 1
15:04, 18 August 2025 301-014.jpg (file) 10 KB Jhudson-fishbeck Additional Water being Applied to Aid in Densification 1
15:00, 18 August 2025 301-008.jpg (file) 15 KB Jhudson-fishbeck AMG-Equipped Bulldozer Placing Sand Subbase Over Underdrain 1
14:57, 18 August 2025 301-006.jpg (file) 12 KB Jhudson-fishbeck Gravel Train Truck Delivering Subbase Material 1
13:34, 18 August 2025 301-004.jpg (file) 34 KB Jhudson-fishbeck Class II Sand Being Placed for Road Subbase 1
13:13, 18 August 2025 301-001.jpg (file) 26 KB Jhudson-fishbeck Class II Sand Placed for Road Subbase 1
12:04, 18 August 2025 Jet Truck.jpg (file) 34 KB Jhudson-fishbeck Vacuum/Jet Truck 1
11:43, 18 August 2025 Tractor Sweeper.jpg (file) 12 KB Jhudson-fishbeck Tractor with Broom Attachment 1
11:42, 18 August 2025 Broom Sweeper.jpg (file) 25 KB Jhudson-fishbeck Broom Sweeper 1
11:36, 18 August 2025 Image042.png (file) 79 KB Jhudson-fishbeck Check Dam Details 1
11:32, 18 August 2025 208-E041.png (file) 161 KB Jhudson-fishbeck Check Dam Details 1
First pagePrevious pageNext pageLast page