Chapter 6: Traffic Control Devices and Implementation
- 6.05 Geometric Design & Safety
- 6.05.01 Lane Transitions and Widths
- 6.05.02 Shy Distance and Buffer Zones
- 6.05.03 Work Zone Clear Zone
- 6.05.04 Vertical Under Clearance
- 6.05.05 Lane Edge
- 6.05.06 Freeway Ramps
- 6.05.07 Relocating Traffic
- A. Road Way
- B. Vertical and Horizontal Clearance
- C. Objects within the Clear Zone
- D. Shoulder Conditions
- 6.05.08 Value Engineering Change Proposals (VECP)
- 6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles
- 6.05.10 Temporary Median Crossovers
- 6.05.11 Traffic Control – Setup, Removal, and Stage Changes
- A. Traffic Switch
- B. Advance Warning of Traffic Switch Operations
- C. Law Enforcement During Traffic Switch Operations
- 6.05.12 Nighttime Traffic Switches
- A. Nighttime Lighting for Traffic Switch Operations
- B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations
- 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
- 6.06.01 Permanent Systems (Cameras, Detectors, Signs)
- 6.06.02 Temporary Portable Cameras
- 6.06.03 Variable Speed Limits
- 6.06.04 Stopped Traffic Advisory System
- 6.06.05 Dynamic Lane Merge Systems (Early/Late Merge)
- 6.06.06 Highway Advisory Radio (HAR)
- 6.06.07 Portable Traffic Detectors/Sensors
- 6.06.08 Ramp Metering
- 6.06.09 Information Response Systems
- A. Trucks Entering, Crossing, and Exiting
- B. Temporary Speed Radar Trailers
- C. Work Space Intrusion
- D. Oversize Vehicle
- 6.06.10 Additional ITS Resources