Difference between revisions of "Work Zone - 3.01 Travel Time"
(→A. Capacity Determination – Freeway: added table) |
(→A. Capacity Determination – Freeway: Created table) |
||
| Line 68: | Line 68: | ||
</div> | </div> | ||
| − | + | '''Table 3-2: Capacity Adjustment Factors***''' | |
| + | <div style="text-align: center;"> | ||
| + | {| class="wikitable" | ||
| + | |+ * When calculating '''''C<sub>a</sub>''''' the final result should range from 1,100 vphpl to 2,000 vphpl. If the result comes back outside of this range please contact MDOT's Work Zone Delivery Engineer for approval. </br> ** If multiple work zone conditions occur, use engineering judgement to determine which factors to use. The final number must fall within th erange of the largest values for that adjustment factor. </br> *** Please send verified delay measurements to the [https://www.michigan.gov/mdot/Business/work-zone-mobility WZMU]. This will allow for adjustments to the numbers based on real world experiences. | ||
| + | |- | ||
| + | ! Work Zone Conditions** !! colspan="3" | Capacity Adjustment Factors* | ||
| + | |- | ||
| + | | style="text-align: left;" | Geometry: traffic uses crossover || rowspan="5" | '''''I<sub>g</sub>'''''|| Subtract || 150 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Geometry: traffic driving on shoulder || Subtract || 150 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Geometry: traffic shift (> 3 feet) || Subtract || 100 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Geometry: work activity adjacent, protected with temporary barrier || Add || 250 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Geometry: work activity adjacent (< 15 feet), protected by channelizing devices || Subtract || 100 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Type: pavement repairs (concrete or HMA) || rowspan="7" | '''''I<sub>wt</sub>''''' || Subtract || 200 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Type: rubblizing, reconstruction || Subtract ||150 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Type: overhead activity (i.e. bridge work – painting, patching) || Subtract || 150 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Type: cold milling, paving (concrete or HMA) || Subtract || 100 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Type: guardrail or barrier || Add || 50 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Type: signing installation || Add || 50 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Type: occurs > 20 feet away || Add || 100 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Activity: adjacent lane distance < 12 feet || rowspan="4" | '''''I<sub>wa</sub>''''' || Subtract || 100 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Activity: adjacent lane distance > 12 feet, < 20 feet || Subtract || 50 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Activity: adjacent lane distance > 20 feet away || Add || 150 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | Work Activity: separated by median || Add || 50 vphpl | ||
| + | |- | ||
| + | | style="text-align: left;" | 12' lane width || rowspan="3" | '''''f<sub>lw</sub>''''' || Multiply|| 1.00 | ||
| + | |- | ||
| + | | style="text-align: left;" | 11' lane width || Multiply || 0.95 | ||
| + | |- | ||
| + | | style="text-align: left;" | 10' lane width || Multiply || 0.90 | ||
| + | |- | ||
| + | | style="text-align: left;" | Restricted one side || rowspan="2" | '''''f<sub>sc</sub>''''' || Multiply || 0.95 | ||
| + | |- | ||
| + | | style="text-align: left;" | Restricted both sides || Multiply || 0.90 | ||
| + | |- | ||
| + | | style="text-align: left;" | Trucks 0% to ≤ 5% || rowspan="5" | '''''f<sub>hv</sub>''''' || Multiply || 1.00 | ||
| + | |- | ||
| + | | style="text-align: left;" | Trucks > 5% to ≤ 10% || Multiply || 0.98 | ||
| + | |- | ||
| + | | style="text-align: left;" | Trucks > 10% to ≤ 15% || Multiply || 0.95 | ||
| + | |- | ||
| + | | style="text-align: left;" | Trucks > 15% to ≤ 20%|| Multiply || 0.93 | ||
| + | |- | ||
| + | | style="text-align: left;" | Trucks > 20%|| Multiply|| 0.90 | ||
| + | |- | ||
| + | | style="text-align: left;" | Entrance ramp within 1,500 feet downstream from the end of the lane closure taper || '''''R''''' || Subtract || Hourly ramp volume (max 600 vph) | ||
| + | |} | ||
| + | </div> | ||
Revision as of 14:38, 21 September 2022
3.01 Travel Time
The travel time delay should be estimated for the work zone to determine project significance as defined in Section 2.01 Project Significance. Consideration should be given to:
- Speed delay: Results from the reduced travel speed in the work zone, in comparison to the existing condition. This is affected by the temporary speed limit and by the capacity of the work zone.
- Queue delay: Additional time vehicles spend waiting in a queue. This is a result of the accumulation of vehicles upstream of a capacity reduction (i.e. a lane closure) when the demand exceeds the capacity.
- Control delay: Interruptions in traffic flow caused by temporary traffic control devices.
- Interruptions occur on all roadway types and include planned events (i.e. traffic regulators, temporary signals, temporary traffic stoppages).
Past experience should also be a factor when estimating travel times. Diversion rate of past projects in similar locations should be utilized to refine your estimation of work zone delay.
3.01.01 Uninterrupted Flow Facilities
Computing travel time for uninterrupted flow facilities (i.e. freeways or non-freeway without stop controlled or signal controlled intersections) consists of determining the speed delay and the queue delay.
A. Capacity Determination – Freeway
Table 3-1 Base Mainline Capacity and Table 3-2 Capacity Adjustment Factors should be used to estimate the capacity for each open lane. Apply factors known to adjust the base work zone capacity.
To begin the development of traffic control options, determine the number of lanes needed to handle the expected demand. An early check of available roadway capacity is critical as the vast majority of additional delay due to a work zone occurs when demand exceeds capacity for any appreciable length of time. The Highway Capacity Manual (HCM) Equation 10-9 can be used to determine the resulting adjusted capacity of the roadway lane:
Ca = {[(Cb + Ig + Iwt + Iwa ) × fhv × flw × fsc ] × N} − R
Where:
Ca = adjusted mainline capacity - vehicles per hour (vph)
Cb = base mainline capacity - vehicles per hour per lane (vphpl)
Ig = adjustment factor for geometrics (ranges from -150 to + 250 vphpl, could be zero). Select multiple factors that apply depending on the conditons; apply the cumulative adjustment factor.
Iwt = adjust factor for intensity of the work activity (ranges from -200 to +200 vphpl, could be zero). Select one factor
Iwa = adjustment factor for location of the work activity (ranges from -150 to +200 vphpl). Select one factor.
fhv = adjustment for heavy vehicles as defined in HCM Equation 10-8. Values have been provided for typical truck volume ranges
flw = adjustment for lane/shoulder widths
fsc = adjustment for lane/shoulder side clearance
N = number of lanes open through the work zone
R = manual adjustment for entrance ramps (vph)
The adjustment factor for work zone geometrics may be considered cumulatively. For example, work zone geometry when traffic uses a crossover and requires a traffic shift >3 feet would apply the cumulative effect of each condition as a part of the adjustment factor.
When determining the factors engineering judgement should be used to determine if the factors should be applied cumulatively. The base mainline capacity (Cb) and work zone capacity adjustment factors are provided in the tables below.
Table 3-1: Base Mainline Capacity
| Number of Lanes | Starting Capacity per Lane | |
|---|---|---|
| Normal | Open | Cb |
| 3 | 1 | 1400 |
| 2 | 1 | 1550 |
| 5 | 2 | 1600 |
| 4 | 2 | 1700 |
| 3 | 2 | 1700 |
| 4 | 3 | 1750 |
Table 3-2: Capacity Adjustment Factors***
| Work Zone Conditions** | Capacity Adjustment Factors* | ||
|---|---|---|---|
| Geometry: traffic uses crossover | Ig | Subtract | 150 vphpl |
| Geometry: traffic driving on shoulder | Subtract | 150 vphpl | |
| Geometry: traffic shift (> 3 feet) | Subtract | 100 vphpl | |
| Geometry: work activity adjacent, protected with temporary barrier | Add | 250 vphpl | |
| Geometry: work activity adjacent (< 15 feet), protected by channelizing devices | Subtract | 100 vphpl | |
| Work Type: pavement repairs (concrete or HMA) | Iwt | Subtract | 200 vphpl |
| Work Type: rubblizing, reconstruction | Subtract | 150 vphpl | |
| Work Type: overhead activity (i.e. bridge work – painting, patching) | Subtract | 150 vphpl | |
| Work Type: cold milling, paving (concrete or HMA) | Subtract | 100 vphpl | |
| Work Type: guardrail or barrier | Add | 50 vphpl | |
| Work Type: signing installation | Add | 50 vphpl | |
| Work Type: occurs > 20 feet away | Add | 100 vphpl | |
| Work Activity: adjacent lane distance < 12 feet | Iwa | Subtract | 100 vphpl |
| Work Activity: adjacent lane distance > 12 feet, < 20 feet | Subtract | 50 vphpl | |
| Work Activity: adjacent lane distance > 20 feet away | Add | 150 vphpl | |
| Work Activity: separated by median | Add | 50 vphpl | |
| 12' lane width | flw | Multiply | 1.00 |
| 11' lane width | Multiply | 0.95 | |
| 10' lane width | Multiply | 0.90 | |
| Restricted one side | fsc | Multiply | 0.95 |
| Restricted both sides | Multiply | 0.90 | |
| Trucks 0% to ≤ 5% | fhv | Multiply | 1.00 |
| Trucks > 5% to ≤ 10% | Multiply | 0.98 | |
| Trucks > 10% to ≤ 15% | Multiply | 0.95 | |
| Trucks > 15% to ≤ 20% | Multiply | 0.93 | |
| Trucks > 20% | Multiply | 0.90 | |
| Entrance ramp within 1,500 feet downstream from the end of the lane closure taper | R | Subtract | Hourly ramp volume (max 600 vph) |