(Added links and created page)
(added links and created page)
Line 69: Line 69:
  
 
* [[Work Zone - 6.05 Geometric Design & Safety|6.05 Geometric Design & Safety]]
 
* [[Work Zone - 6.05 Geometric Design & Safety|6.05 Geometric Design & Safety]]
−
** 6.05.01 Lane Transitions and Widths
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.01 Lane Transitions and Widths|6.05.01 Lane Transitions and Widths]]
−
** 6.05.02 Shy Distance and Buffer Zones
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.02 Shy Distance and Buffer Zones|6.05.02 Shy Distance and Buffer Zones]]
−
** 6.05.03 Work Zone Clear Zone
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.03 Work Zone Clear Zone|6.05.03 Work Zone Clear Zone]]
−
** 6.05.04 Vertical Under Clearance
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.04 Vertical Under Clearance|6.05.04 Vertical Under Clearance]]
−
** 6.05.05 Lane Edge
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.05 Lane Edge|6.05.05 Lane Edge]]
−
** 6.05.06 Freeway Ramps
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.06 Freeway Ramps|6.05.06 Freeway Ramps]]
−
** 6.05.07 Relocating Traffic
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.07 Relocating Traffic|6.05.07 Relocating Traffic]]
−
*** A. Road Way
+
*** [[Work Zone - 6.05 Geometric Design & Safety#A. Road Way|A. Road Way]]
−
*** B. Vertical and Horizontal Clearance
+
*** [[Work Zone - 6.05 Geometric Design & Safety#B. Vertical and Horizontal Clearance|B. Vertical and Horizontal Clearance]]
−
*** C. Objects within the Clear Zone
+
*** [[Work Zone - 6.05 Geometric Design & Safety#C. Objects within the Clear Zone|C. Objects within the Clear Zone]]
−
*** D. Shoulder Conditions
+
*** [[Work Zone - 6.05 Geometric Design & Safety#D. Shoulder Conditions|D. Shoulder Conditions]]
−
** 6.05.08 Value Engineering Change Proposals (VECP)
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.08 Value Engineering Change Proposals (VECP)|6.05.08 Value Engineering Change Proposals (VECP)]]
−
** 6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles|6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles]]
−
** 6.05.10 Temporary Median Crossovers
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.10 Temporary Median Crossovers|6.05.10 Temporary Median Crossovers]]
−
** 6.05.11 Traffic Control – Setup, Removal, and Stage Changes
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.11 Traffic Control – Setup, Removal, and Stage Changes|6.05.11 Traffic Control – Setup, Removal, and Stage Changes]]
−
*** A. Traffic Switch
+
*** [[Work Zone - 6.05 Geometric Design & Safety#A. Traffic Switch|A. Traffic Switch]]
−
*** B. Advance Warning of Traffic Switch Operations
+
*** [[Work Zone - 6.05 Geometric Design & Safety#B. Advance Warning of Traffic Switch Operations|B. Advance Warning of Traffic Switch Operations]]
−
*** C. Law Enforcement During Traffic Switch Operations
+
*** [[Work Zone - 6.05 Geometric Design & Safety#C. Law Enforcement During Traffic Switch Operations|C. Law Enforcement During Traffic Switch Operations]]
−
** 6.05.12 Nighttime Traffic Switches
+
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.12 Nighttime Traffic Switches|6.05.12 Nighttime Traffic Switches]]
−
*** A. Nighttime Lighting for Traffic Switch Operations
+
*** [[Work Zone - 6.05 Geometric Design & Safety#A. Nighttime Lighting for Traffic Switch Operations|A. Nighttime Lighting for Traffic Switch Operations]]
−
*** B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations
+
*** [[Work Zone - 6.05 Geometric Design & Safety#B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations|B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations]]
  
−
* 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
+
* [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology|6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology]]
 
** 6.06.01 Permanent Systems (Cameras, Detectors, Signs)
 
** 6.06.01 Permanent Systems (Cameras, Detectors, Signs)
 
** 6.06.02 Temporary Portable Cameras
 
** 6.06.02 Temporary Portable Cameras

Revision as of 12:37, 27 September 2022

Chapter 6: Traffic Control Devices and Implementation

  • 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
    • 6.06.01 Permanent Systems (Cameras, Detectors, Signs)
    • 6.06.02 Temporary Portable Cameras
    • 6.06.03 Variable Speed Limits
    • 6.06.04 Stopped Traffic Advisory System
    • 6.06.05 Dynamic Lane Merge Systems (Early/Late Merge)
    • 6.06.06 Highway Advisory Radio (HAR)
    • 6.06.07 Portable Traffic Detectors/Sensors
    • 6.06.08 Ramp Metering
    • 6.06.09 Information Response Systems
      • A. Trucks Entering, Crossing, and Exiting
      • B. Temporary Speed Radar Trailers
      • C. Work Space Intrusion
      • D. Oversize Vehicle
    • 6.06.10 Additional ITS Resources