(added content) |
(created 3 pages) |
||
| Line 1: | Line 1: | ||
=Chapter 8: Maintenance and Surveying Operations= | =Chapter 8: Maintenance and Surveying Operations= | ||
| − | * 8.01 Introduction | + | * [[Work Zone - 8.01 Introduction|8.01 Introduction]] |
| − | * 8.02 Typical Traffic Control Plans | + | * [[Work Zone - 8.02 Typical Traffic Control Plans|8.02 Typical Traffic Control Plans]] |
| − | * 8.03 Work Zone Definition | + | * [[Work Zone - 8.03 Work Zone Definition|8.03 Work Zone Definition]] |
* 8.04 Work Zone Durations | * 8.04 Work Zone Durations | ||
Revision as of 14:34, 27 September 2022
Chapter 8: Maintenance and Surveying Operations
- 8.04 Work Zone Durations
- 8.04.01 Long-Term Stationary Work
- 8.04.02 Intermediary-Term Stationary Work
- 8.04.03 Short-Term Stationary Work
- 8.04.04 Short Duration Work
- 8.04.05 Mobile Work
- 8.05 Mobility and Safety
- 8.06 General Traffic Control Guidelines
- 8.06.01 Regular Work Zone Inspections
- 8.06.02 Partial Lane Closures
- 8.06.03 Temporary Signs
- A. Portable Signs
- 8.06.04 Existing Permanent Signs
- 8.06.05 Channelizing Devices
- 8.06.06 Traffic Regulators
- 8.06.07 Arrow Boards
- 8.07 Mobile Operations
- 8.07.01 Adequate Sight Distance
- 8.07.02 Shadow Vehicles
- 8.07.03 Mobile Attenuators
- 8.07.04 Examples of Truck Mounted Attenuator Applications
- 8.07.05 Equipment Requirements for Truck Mounted Attenuator
- 8.08 Survey Operations
- 8.08.01 Working without TTCD
- 8.08.02 Setting up Traffic Control
- 8.08.03 Temporary Traffic Control Considerations
- 8.08.04 Surveying Operations, Locations, and Durations
- 8.08.05 Equipment Requirements for Truck Mounted Attenuator