(Added Links)
(Added content)
Line 1: Line 1:
 
===Chapter 6: Traffic Control Devices and Implementation===
 
===Chapter 6: Traffic Control Devices and Implementation===
 
* [[Work Zone - 6.01 Temporary Traffic Control| 6.01 Temporary Traffic Control]]
 
* [[Work Zone - 6.01 Temporary Traffic Control| 6.01 Temporary Traffic Control]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.01 Cones|6.01.01 Cones]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.01 Cones|6.01.01 Cones]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.02 Plastic Drums|6.01.02 Plastic Drums]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.02 Plastic Drums|6.01.02 Plastic Drums]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.03 42-Inch Channelizing Devices|6.01.03 42-Inch Channelizing Devices]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.03 42-Inch Channelizing Devices|6.01.03 42-Inch Channelizing Devices]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.04 Tubular Markers|6.01.04 Tubular Markers]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.04 Tubular Markers|6.01.04 Tubular Markers]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.05 Delineators|6.01.05 Delineators]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.05 Delineators|6.01.05 Delineators]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.06 Barricades|6.01.06 Barricades]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.06 Barricades|6.01.06 Barricades]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.07 Temporary Barriers|6.01.07 Temporary Barriers]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.07 Temporary Barriers|6.01.07 Temporary Barriers]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.08 Temporary Signs|6.01.08 Temporary Signs]]
+
*** A. Movable Barriers
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.09 Sign Covers|6.01.09 Sign Covers]]
+
*** B. Mobile Barrier Walls
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.10 Signing Coordination|6.01.10 Signing Coordination]]
+
*** C. Water Filled Barrier
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.11 Project Specific Signing|6.01.11 Project Specific Signing]]
+
*** D. Barrier Endings (attenuation)
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.12 Temporary Pavement Markings|6.01.12 Temporary Pavement Markings]]
+
*** E. Mobile Attenuators
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.13 Lighting|6.01.13 Lighting]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.08 Temporary Signs|6.01.08 Temporary Signs]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.14 Arrow Boards|6.01.14 Arrow Boards]]
+
*** A. Ground-Driven Temporary Signing
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.15 Portable Changeable Message Sign (PCMS)|6.01.15 Portable Changeable Message Sign]]
+
*** B. Portable Temporary Signing
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.16 Temporary Traffic Signals|6.01.16 Temporary Traffic Signals]]
+
*** C. Portable Temporary Signing – Roll-up
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.17 Automated Flagger Assistance Device (AFAD)|6.01.17 Automated Flagger Assistance Device (AFAD)]]
+
*** D. Innovative Temporary Signing
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.18 Glare Screening|6.01.18 Glare Screening]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.09 Sign Covers|6.01.09 Sign Covers]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.19 Transverse Temporary Rumble Strips|6.01.19 Transverse Temporary Rumble Strips]]
+
*** A. Directional Guide Signs
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.20 Existing Longitudinal Rumble Strips|6.01.20 Existing Longitudinal Rumble Strips]]
+
*** B. Overhead Signs
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.21 Pilot Vehicles|6.01.21 Pilot Vehicles]]
+
*** C. Regulatory Signs
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.22 Innovative Traffic Control Devices|6.01.22 Innovative Traffic Control Devices]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.10 Signing Coordination|6.01.10 Signing Coordination]]
−
**[[Work Zone - 6.01 Temporary Traffic Control#6.01.23 Rolling Roadblocks|6.01.23 Rolling Roadblocks]]
+
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.11 Project Specific Signing|6.01.11 Project Specific Signing]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.12 Temporary Pavement Markings|6.01.12 Temporary Pavement Markings]]
 +
*** A. Pavement Marking Removal
 +
*** B. Shift Markings
 +
*** C. Temporary Raised Pavement Markers (TRPM), Type 3
 +
*** D. Pavement Marking Cover
 +
*** E. Curing Compound Removal
 +
*** F. Edge Line Markings
 +
*** G. Capital Preventive Maintenance (CPM) Projects
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.13 Lighting|6.01.13 Lighting]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.14 Arrow Boards|6.01.14 Arrow Boards]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.15 Portable Changeable Message Sign (PCMS)|6.01.15 Portable Changeable Message Sign]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.16 Temporary Traffic Signals|6.01.16 Temporary Traffic Signals]]
 +
*** A. Temporary Mounted Signal System
 +
*** B. Temporary Portable Signal System
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.17 Automated Flagger Assistance Device (AFAD)|6.01.17 Automated Flagger Assistance Device (AFAD)]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.18 Glare Screening|6.01.18 Glare Screening]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.19 Transverse Temporary Rumble Strips|6.01.19 Transverse Temporary Rumble Strips]]
 +
*** A. Fixed Temporary Transverse Rumble Strips – Freeway
 +
*** B. Fixed Temporary Transverse Rumble Strips – Non-Freeway
 +
*** C. Portable Temporary Transverse Rumble Strips – Non-Freeway
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.20 Existing Longitudinal Rumble Strips|6.01.20 Existing Longitudinal Rumble Strips]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.21 Pilot Vehicles|6.01.21 Pilot Vehicles]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.22 Innovative Traffic Control Devices|6.01.22 Innovative Traffic Control Devices]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.23 Rolling Roadblocks|6.01.23 Rolling Roadblocks]]
 +
*** A. Work Activities
 +
*** B. Construction
 +
*** C. Operations Plan
  
 
* [[Work Zone - 6.02 Speed Limits in Work Zones|6.02 Speed Limits in Work Zones]]
 
* [[Work Zone - 6.02 Speed Limits in Work Zones|6.02 Speed Limits in Work Zones]]
 
** [[Work Zone - 6.02 Speed Limits in Work Zones#6.02.01 Temporary Traffic Control Orders (UPDATED 5/28/2021) | 6.02.01 Temporary Traffic Control Orders]]
 
** [[Work Zone - 6.02 Speed Limits in Work Zones#6.02.01 Temporary Traffic Control Orders (UPDATED 5/28/2021) | 6.02.01 Temporary Traffic Control Orders]]
 +
 
* 6.03 Quality Guidelines
 
* 6.03 Quality Guidelines
 +
** 6.03.01 Channelizing Device Quality Process
 +
*** A. Process
 +
 
* 6.04 Detours & Alternate Routes
 
* 6.04 Detours & Alternate Routes
 +
** 6.04.01 Full Road Closures
 +
** 6.04.02 Directional Detours
 +
** 6.04.03 Ramp Closures
 +
** 6.04.04 Detour Signing
 +
*** A. Sign Color and Sizes
 +
*** B. End Detour
 +
*** C. Portable Changeable Message Signs (PCMS)
 +
 
* 6.05 Geometric Design & Safety
 
* 6.05 Geometric Design & Safety
 +
** 6.05.01 Lane Transitions and Widths
 +
** 6.05.02 Shy Distance and Buffer Zones
 +
** 6.05.03 Work Zone Clear Zone
 +
** 6.05.04 Vertical Under Clearance
 +
** 6.05.05 Lane Edge
 +
** 6.05.06 Freeway Ramps
 +
** 6.05.07 Relocating Traffic
 +
*** A. Road Way
 +
*** B. Vertical and Horizontal Clearance
 +
*** C. Objects within the Clear Zone
 +
*** D. Shoulder Conditions
 +
** 6.05.08 Value Engineering Change Proposals (VECP)
 +
** 6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles
 +
** 6.05.10 Temporary Median Crossovers
 +
** 6.05.11 Traffic Control – Setup, Removal, and Stage Changes
 +
*** A. Traffic Switch
 +
*** B. Advance Warning of Traffic Switch Operations
 +
*** C. Law Enforcement During Traffic Switch Operations
 +
** 6.05.12 Nighttime Traffic Switches
 +
*** A. Nighttime Lighting for Traffic Switch Operations
 +
*** B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations
 +
 
* 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
 
* 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
 +
** 6.06.01 Permanent Systems (Cameras, Detectors, Signs)
 +
** 6.06.02 Temporary Portable Cameras
 +
** 6.06.03 Variable Speed Limits
 +
** 6.06.04 Stopped Traffic Advisory System
 +
** 6.06.05 Dynamic Lane Merge Systems (Early/Late Merge)
 +
** 6.06.06 Highway Advisory Radio (HAR)
 +
** 6.06.07 Portable Traffic Detectors/Sensors
 +
** 6.06.08 Ramp Metering
 +
** 6.06.09 Information Response Systems
 +
*** A. Trucks Entering, Crossing, and Exiting
 +
*** B. Temporary Speed Radar Trailers
 +
*** C. Work Space Intrusion
 +
*** D. Oversize Vehicle
 +
** 6.06.10 Additional ITS Resources

Revision as of 15:31, 19 September 2022

Chapter 6: Traffic Control Devices and Implementation

  • 6.03 Quality Guidelines
    • 6.03.01 Channelizing Device Quality Process
      • A. Process
  • 6.04 Detours & Alternate Routes
    • 6.04.01 Full Road Closures
    • 6.04.02 Directional Detours
    • 6.04.03 Ramp Closures
    • 6.04.04 Detour Signing
      • A. Sign Color and Sizes
      • B. End Detour
      • C. Portable Changeable Message Signs (PCMS)
  • 6.05 Geometric Design & Safety
    • 6.05.01 Lane Transitions and Widths
    • 6.05.02 Shy Distance and Buffer Zones
    • 6.05.03 Work Zone Clear Zone
    • 6.05.04 Vertical Under Clearance
    • 6.05.05 Lane Edge
    • 6.05.06 Freeway Ramps
    • 6.05.07 Relocating Traffic
      • A. Road Way
      • B. Vertical and Horizontal Clearance
      • C. Objects within the Clear Zone
      • D. Shoulder Conditions
    • 6.05.08 Value Engineering Change Proposals (VECP)
    • 6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles
    • 6.05.10 Temporary Median Crossovers
    • 6.05.11 Traffic Control – Setup, Removal, and Stage Changes
      • A. Traffic Switch
      • B. Advance Warning of Traffic Switch Operations
      • C. Law Enforcement During Traffic Switch Operations
    • 6.05.12 Nighttime Traffic Switches
      • A. Nighttime Lighting for Traffic Switch Operations
      • B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations
  • 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
    • 6.06.01 Permanent Systems (Cameras, Detectors, Signs)
    • 6.06.02 Temporary Portable Cameras
    • 6.06.03 Variable Speed Limits
    • 6.06.04 Stopped Traffic Advisory System
    • 6.06.05 Dynamic Lane Merge Systems (Early/Late Merge)
    • 6.06.06 Highway Advisory Radio (HAR)
    • 6.06.07 Portable Traffic Detectors/Sensors
    • 6.06.08 Ramp Metering
    • 6.06.09 Information Response Systems
      • A. Trucks Entering, Crossing, and Exiting
      • B. Temporary Speed Radar Trailers
      • C. Work Space Intrusion
      • D. Oversize Vehicle
    • 6.06.10 Additional ITS Resources