(Added Links) |
(Added content) |
||
| Line 1: | Line 1: | ||
===Chapter 6: Traffic Control Devices and Implementation=== | ===Chapter 6: Traffic Control Devices and Implementation=== | ||
* [[Work Zone - 6.01 Temporary Traffic Control| 6.01 Temporary Traffic Control]] | * [[Work Zone - 6.01 Temporary Traffic Control| 6.01 Temporary Traffic Control]] | ||
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.01 Cones|6.01.01 Cones]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.01 Cones|6.01.01 Cones]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.02 Plastic Drums|6.01.02 Plastic Drums]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.02 Plastic Drums|6.01.02 Plastic Drums]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.03 42-Inch Channelizing Devices|6.01.03 42-Inch Channelizing Devices]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.03 42-Inch Channelizing Devices|6.01.03 42-Inch Channelizing Devices]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.04 Tubular Markers|6.01.04 Tubular Markers]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.04 Tubular Markers|6.01.04 Tubular Markers]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.05 Delineators|6.01.05 Delineators]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.05 Delineators|6.01.05 Delineators]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.06 Barricades|6.01.06 Barricades]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.06 Barricades|6.01.06 Barricades]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.07 Temporary Barriers|6.01.07 Temporary Barriers]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.07 Temporary Barriers|6.01.07 Temporary Barriers]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.08 Temporary Signs|6.01.08 Temporary Signs]] | + | *** A. Movable Barriers |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.09 Sign Covers|6.01.09 Sign Covers]] | + | *** B. Mobile Barrier Walls |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.10 Signing Coordination|6.01.10 Signing Coordination]] | + | *** C. Water Filled Barrier |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.11 Project Specific Signing|6.01.11 Project Specific Signing]] | + | *** D. Barrier Endings (attenuation) |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.12 Temporary Pavement Markings|6.01.12 Temporary Pavement Markings]] | + | *** E. Mobile Attenuators |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.13 Lighting|6.01.13 Lighting]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.08 Temporary Signs|6.01.08 Temporary Signs]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.14 Arrow Boards|6.01.14 Arrow Boards]] | + | *** A. Ground-Driven Temporary Signing |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.15 Portable Changeable Message Sign (PCMS)|6.01.15 Portable Changeable Message Sign]] | + | *** B. Portable Temporary Signing |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.16 Temporary Traffic Signals|6.01.16 Temporary Traffic Signals]] | + | *** C. Portable Temporary Signing – Roll-up |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.17 Automated Flagger Assistance Device (AFAD)|6.01.17 Automated Flagger Assistance Device (AFAD)]] | + | *** D. Innovative Temporary Signing |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.18 Glare Screening|6.01.18 Glare Screening]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.09 Sign Covers|6.01.09 Sign Covers]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.19 Transverse Temporary Rumble Strips|6.01.19 Transverse Temporary Rumble Strips]] | + | *** A. Directional Guide Signs |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.20 Existing Longitudinal Rumble Strips|6.01.20 Existing Longitudinal Rumble Strips]] | + | *** B. Overhead Signs |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.21 Pilot Vehicles|6.01.21 Pilot Vehicles]] | + | *** C. Regulatory Signs |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.22 Innovative Traffic Control Devices|6.01.22 Innovative Traffic Control Devices]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.10 Signing Coordination|6.01.10 Signing Coordination]] |
| − | **[[Work Zone - 6.01 Temporary Traffic Control#6.01.23 Rolling Roadblocks|6.01.23 Rolling Roadblocks]] | + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.11 Project Specific Signing|6.01.11 Project Specific Signing]] |
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.12 Temporary Pavement Markings|6.01.12 Temporary Pavement Markings]] | ||
| + | *** A. Pavement Marking Removal | ||
| + | *** B. Shift Markings | ||
| + | *** C. Temporary Raised Pavement Markers (TRPM), Type 3 | ||
| + | *** D. Pavement Marking Cover | ||
| + | *** E. Curing Compound Removal | ||
| + | *** F. Edge Line Markings | ||
| + | *** G. Capital Preventive Maintenance (CPM) Projects | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.13 Lighting|6.01.13 Lighting]] | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.14 Arrow Boards|6.01.14 Arrow Boards]] | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.15 Portable Changeable Message Sign (PCMS)|6.01.15 Portable Changeable Message Sign]] | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.16 Temporary Traffic Signals|6.01.16 Temporary Traffic Signals]] | ||
| + | *** A. Temporary Mounted Signal System | ||
| + | *** B. Temporary Portable Signal System | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.17 Automated Flagger Assistance Device (AFAD)|6.01.17 Automated Flagger Assistance Device (AFAD)]] | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.18 Glare Screening|6.01.18 Glare Screening]] | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.19 Transverse Temporary Rumble Strips|6.01.19 Transverse Temporary Rumble Strips]] | ||
| + | *** A. Fixed Temporary Transverse Rumble Strips – Freeway | ||
| + | *** B. Fixed Temporary Transverse Rumble Strips – Non-Freeway | ||
| + | *** C. Portable Temporary Transverse Rumble Strips – Non-Freeway | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.20 Existing Longitudinal Rumble Strips|6.01.20 Existing Longitudinal Rumble Strips]] | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.21 Pilot Vehicles|6.01.21 Pilot Vehicles]] | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.22 Innovative Traffic Control Devices|6.01.22 Innovative Traffic Control Devices]] | ||
| + | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.23 Rolling Roadblocks|6.01.23 Rolling Roadblocks]] | ||
| + | *** A. Work Activities | ||
| + | *** B. Construction | ||
| + | *** C. Operations Plan | ||
* [[Work Zone - 6.02 Speed Limits in Work Zones|6.02 Speed Limits in Work Zones]] | * [[Work Zone - 6.02 Speed Limits in Work Zones|6.02 Speed Limits in Work Zones]] | ||
** [[Work Zone - 6.02 Speed Limits in Work Zones#6.02.01 Temporary Traffic Control Orders (UPDATED 5/28/2021) | 6.02.01 Temporary Traffic Control Orders]] | ** [[Work Zone - 6.02 Speed Limits in Work Zones#6.02.01 Temporary Traffic Control Orders (UPDATED 5/28/2021) | 6.02.01 Temporary Traffic Control Orders]] | ||
| + | |||
* 6.03 Quality Guidelines | * 6.03 Quality Guidelines | ||
| + | ** 6.03.01 Channelizing Device Quality Process | ||
| + | *** A. Process | ||
| + | |||
* 6.04 Detours & Alternate Routes | * 6.04 Detours & Alternate Routes | ||
| + | ** 6.04.01 Full Road Closures | ||
| + | ** 6.04.02 Directional Detours | ||
| + | ** 6.04.03 Ramp Closures | ||
| + | ** 6.04.04 Detour Signing | ||
| + | *** A. Sign Color and Sizes | ||
| + | *** B. End Detour | ||
| + | *** C. Portable Changeable Message Signs (PCMS) | ||
| + | |||
* 6.05 Geometric Design & Safety | * 6.05 Geometric Design & Safety | ||
| + | ** 6.05.01 Lane Transitions and Widths | ||
| + | ** 6.05.02 Shy Distance and Buffer Zones | ||
| + | ** 6.05.03 Work Zone Clear Zone | ||
| + | ** 6.05.04 Vertical Under Clearance | ||
| + | ** 6.05.05 Lane Edge | ||
| + | ** 6.05.06 Freeway Ramps | ||
| + | ** 6.05.07 Relocating Traffic | ||
| + | *** A. Road Way | ||
| + | *** B. Vertical and Horizontal Clearance | ||
| + | *** C. Objects within the Clear Zone | ||
| + | *** D. Shoulder Conditions | ||
| + | ** 6.05.08 Value Engineering Change Proposals (VECP) | ||
| + | ** 6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles | ||
| + | ** 6.05.10 Temporary Median Crossovers | ||
| + | ** 6.05.11 Traffic Control – Setup, Removal, and Stage Changes | ||
| + | *** A. Traffic Switch | ||
| + | *** B. Advance Warning of Traffic Switch Operations | ||
| + | *** C. Law Enforcement During Traffic Switch Operations | ||
| + | ** 6.05.12 Nighttime Traffic Switches | ||
| + | *** A. Nighttime Lighting for Traffic Switch Operations | ||
| + | *** B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations | ||
| + | |||
* 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology | * 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology | ||
| + | ** 6.06.01 Permanent Systems (Cameras, Detectors, Signs) | ||
| + | ** 6.06.02 Temporary Portable Cameras | ||
| + | ** 6.06.03 Variable Speed Limits | ||
| + | ** 6.06.04 Stopped Traffic Advisory System | ||
| + | ** 6.06.05 Dynamic Lane Merge Systems (Early/Late Merge) | ||
| + | ** 6.06.06 Highway Advisory Radio (HAR) | ||
| + | ** 6.06.07 Portable Traffic Detectors/Sensors | ||
| + | ** 6.06.08 Ramp Metering | ||
| + | ** 6.06.09 Information Response Systems | ||
| + | *** A. Trucks Entering, Crossing, and Exiting | ||
| + | *** B. Temporary Speed Radar Trailers | ||
| + | *** C. Work Space Intrusion | ||
| + | *** D. Oversize Vehicle | ||
| + | ** 6.06.10 Additional ITS Resources | ||
Revision as of 15:31, 19 September 2022
Chapter 6: Traffic Control Devices and Implementation
- 6.01 Temporary Traffic Control
- 6.01.01 Cones
- 6.01.02 Plastic Drums
- 6.01.03 42-Inch Channelizing Devices
- 6.01.04 Tubular Markers
- 6.01.05 Delineators
- 6.01.06 Barricades
- 6.01.07 Temporary Barriers
- A. Movable Barriers
- B. Mobile Barrier Walls
- C. Water Filled Barrier
- D. Barrier Endings (attenuation)
- E. Mobile Attenuators
- 6.01.08 Temporary Signs
- A. Ground-Driven Temporary Signing
- B. Portable Temporary Signing
- C. Portable Temporary Signing – Roll-up
- D. Innovative Temporary Signing
- 6.01.09 Sign Covers
- A. Directional Guide Signs
- B. Overhead Signs
- C. Regulatory Signs
- 6.01.10 Signing Coordination
- 6.01.11 Project Specific Signing
- 6.01.12 Temporary Pavement Markings
- A. Pavement Marking Removal
- B. Shift Markings
- C. Temporary Raised Pavement Markers (TRPM), Type 3
- D. Pavement Marking Cover
- E. Curing Compound Removal
- F. Edge Line Markings
- G. Capital Preventive Maintenance (CPM) Projects
- 6.01.13 Lighting
- 6.01.14 Arrow Boards
- 6.01.15 Portable Changeable Message Sign
- 6.01.16 Temporary Traffic Signals
- A. Temporary Mounted Signal System
- B. Temporary Portable Signal System
- 6.01.17 Automated Flagger Assistance Device (AFAD)
- 6.01.18 Glare Screening
- 6.01.19 Transverse Temporary Rumble Strips
- A. Fixed Temporary Transverse Rumble Strips – Freeway
- B. Fixed Temporary Transverse Rumble Strips – Non-Freeway
- C. Portable Temporary Transverse Rumble Strips – Non-Freeway
- 6.01.20 Existing Longitudinal Rumble Strips
- 6.01.21 Pilot Vehicles
- 6.01.22 Innovative Traffic Control Devices
- 6.01.23 Rolling Roadblocks
- A. Work Activities
- B. Construction
- C. Operations Plan
- 6.03 Quality Guidelines
- 6.03.01 Channelizing Device Quality Process
- A. Process
- 6.03.01 Channelizing Device Quality Process
- 6.04 Detours & Alternate Routes
- 6.04.01 Full Road Closures
- 6.04.02 Directional Detours
- 6.04.03 Ramp Closures
- 6.04.04 Detour Signing
- A. Sign Color and Sizes
- B. End Detour
- C. Portable Changeable Message Signs (PCMS)
- 6.05 Geometric Design & Safety
- 6.05.01 Lane Transitions and Widths
- 6.05.02 Shy Distance and Buffer Zones
- 6.05.03 Work Zone Clear Zone
- 6.05.04 Vertical Under Clearance
- 6.05.05 Lane Edge
- 6.05.06 Freeway Ramps
- 6.05.07 Relocating Traffic
- A. Road Way
- B. Vertical and Horizontal Clearance
- C. Objects within the Clear Zone
- D. Shoulder Conditions
- 6.05.08 Value Engineering Change Proposals (VECP)
- 6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles
- 6.05.10 Temporary Median Crossovers
- 6.05.11 Traffic Control – Setup, Removal, and Stage Changes
- A. Traffic Switch
- B. Advance Warning of Traffic Switch Operations
- C. Law Enforcement During Traffic Switch Operations
- 6.05.12 Nighttime Traffic Switches
- A. Nighttime Lighting for Traffic Switch Operations
- B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations
- 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
- 6.06.01 Permanent Systems (Cameras, Detectors, Signs)
- 6.06.02 Temporary Portable Cameras
- 6.06.03 Variable Speed Limits
- 6.06.04 Stopped Traffic Advisory System
- 6.06.05 Dynamic Lane Merge Systems (Early/Late Merge)
- 6.06.06 Highway Advisory Radio (HAR)
- 6.06.07 Portable Traffic Detectors/Sensors
- 6.06.08 Ramp Metering
- 6.06.09 Information Response Systems
- A. Trucks Entering, Crossing, and Exiting
- B. Temporary Speed Radar Trailers
- C. Work Space Intrusion
- D. Oversize Vehicle
- 6.06.10 Additional ITS Resources