(Created page)
 
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
===Chapter 6: Traffic Control Devices and Implementation===
 
===Chapter 6: Traffic Control Devices and Implementation===
−
* 6.01 Temporary Traffic Control
+
* [[Work Zone - 6.01 Temporary Traffic Control| 6.01 Temporary Traffic Control]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.01 Cones|6.01.01 Cones]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.02 Plastic Drums|6.01.02 Plastic Drums]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.03 42-Inch Channelizing Devices|6.01.03 42-Inch Channelizing Devices]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.04 Tubular Markers|6.01.04 Tubular Markers]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.05 Delineators|6.01.05 Delineators]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.06 Barricades|6.01.06 Barricades]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.07 Temporary Barriers|6.01.07 Temporary Barriers]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#A. Movable Barriers|A. Movable Barriers]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#B. Mobile Barrier Walls|B. Mobile Barrier Walls]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#C. Water Filled Barrier|C. Water Filled Barrier]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#D. Barrier Endings (attenuation)|D. Barrier Endings (attenuation)]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#E. Mobile Attenuators|E. Mobile Attenuators]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.08 Temporary Signs|6.01.08 Temporary Signs]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#A. Ground-Driven Temporary Signing|A. Ground-Driven Temporary Signing]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#B. Portable Temporary Signing|B. Portable Temporary Signing]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#C. Portable Temporary Signing – Roll-up|C. Portable Temporary Signing – Roll-up]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#D. Innovative Temporary Signing|D. Innovative Temporary Signing]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.09 Sign Covers|6.01.09 Sign Covers]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#A. Directional Guide Signs|A. Directional Guide Signs]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#B. Overhead Signs|B. Overhead Signs]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#C. Regulatory Signs|C. Regulatory Signs]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.10 Signing Coordination|6.01.10 Signing Coordination]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.11 Project Specific Signing|6.01.11 Project Specific Signing]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.12 Temporary Pavement Markings|6.01.12 Temporary Pavement Markings]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#A. Pavement Marking Removal|A. Pavement Marking Removal]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#B. Shift Markings|B. Shift Markings]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#C. Temporary Raised Pavement Markers (TRPM), Type 3|C. Temporary Raised Pavement Markers (TRPM), Type 3]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#D. Pavement Marking Cover|D. Pavement Marking Cover]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#E. Curing Compound Removal|E. Curing Compound Removal]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#F. Edge Line Markings|F. Edge Line Markings]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#G. Capital Preventive Maintenance (CPM) Projects|G. Capital Preventive Maintenance (CPM) Projects]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.13 Lighting|6.01.13 Lighting]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.14 Arrow Boards|6.01.14 Arrow Boards]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.15 Portable Changeable Message Sign (PCMS)|6.01.15 Portable Changeable Message Sign]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.16 Temporary Traffic Signals|6.01.16 Temporary Traffic Signals]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#A. Temporary Mounted Signal System|A. Temporary Mounted Signal System]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#B. Temporary Portable Signal System|B. Temporary Portable Signal System]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.17 Automated Flagger Assistance Device (AFAD)|6.01.17 Automated Flagger Assistance Device (AFAD)]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.18 Glare Screening|6.01.18 Glare Screening]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.19 Transverse Temporary Rumble Strips|6.01.19 Transverse Temporary Rumble Strips]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#A. Fixed Temporary Transverse Rumble Strips – Freeway|A. Fixed Temporary Transverse Rumble Strips – Freeway]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#B. Fixed Temporary Transverse Rumble Strips – Non-Freeway|B. Fixed Temporary Transverse Rumble Strips – Non-Freeway]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#C. Portable Temporary Transverse Rumble Strips – Non-Freeway|C. Portable Temporary Transverse Rumble Strips – Non-Freeway]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.20 Existing Longitudinal Rumble Strips|6.01.20 Existing Longitudinal Rumble Strips]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.21 Pilot Vehicles|6.01.21 Pilot Vehicles]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.22 Innovative Traffic Control Devices|6.01.22 Innovative Traffic Control Devices]]
 +
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.23 Rolling Roadblocks|6.01.23 Rolling Roadblocks]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#A. Work Activities|A. Work Activities]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#B. Construction|B. Construction]]
 +
*** [[Work Zone - 6.01 Temporary Traffic Control#C. Operations Plan|C. Operations Plan]]
 +
 
 
* [[Work Zone - 6.02 Speed Limits in Work Zones|6.02 Speed Limits in Work Zones]]
 
* [[Work Zone - 6.02 Speed Limits in Work Zones|6.02 Speed Limits in Work Zones]]
−
* 6.03 Quality Guidelines
+
** [[Work Zone - 6.02 Speed Limits in Work Zones#6.02.01 Temporary Traffic Control Orders (UPDATED 5/28/2021) | 6.02.01 Temporary Traffic Control Orders]]
−
* 6.04 Detours & Alternate Routes
+
 
−
* 6.05 Geometric Design & Safety
+
* [[Work Zone - 6.03 Quality Guidelines|6.03 Quality Guidelines]]
−
* 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
+
** [[Work Zone - 6.03 Quality Guidelines#6.03.01 Channelizing Device Quality Process|6.03.01 Channelizing Device Quality Process]]
 +
*** [[Work Zone - 6.03 Quality Guidelines#A. Process|A. Process]]
 +
 
 +
* [[Work Zone - 6.04 Detours & Alternate Routes|6.04 Detours & Alternate Routes]]
 +
** [[Work Zone - 6.04 Detours & Alternate Routes#6.04.01 Full Road Closures|6.04.01 Full Road Closures]]
 +
** [[Work Zone - 6.04 Detours & Alternate Routes#6.04.02 Directional Detours|6.04.02 Directional Detours]]
 +
** [[Work Zone - 6.04 Detours & Alternate Routes#6.04.03 Ramp Closures|6.04.03 Ramp Closures]]
 +
** [[Work Zone - 6.04 Detours & Alternate Routes#6.04.04 Detour Signing|6.04.04 Detour Signing]]
 +
*** [[Work Zone - 6.04 Detours & Alternate Routes#A. Sign Color and Sizes|A. Sign Color and Sizes]]
 +
*** [[Work Zone - 6.04 Detours & Alternate Routes#B. End Detour|B. End Detour]]
 +
*** [[Work Zone - 6.04 Detours & Alternate Routes#C. Portable Changeable Message Signs (PCMS)|C. Portable Changeable Message Signs (PCMS)]]
 +
 
 +
* [[Work Zone - 6.05 Geometric Design & Safety|6.05 Geometric Design & Safety]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.01 Lane Transitions and Widths|6.05.01 Lane Transitions and Widths]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.02 Shy Distance and Buffer Zones|6.05.02 Shy Distance and Buffer Zones]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.03 Work Zone Clear Zone|6.05.03 Work Zone Clear Zone]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.04 Vertical Under Clearance|6.05.04 Vertical Under Clearance]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.05 Lane Edge|6.05.05 Lane Edge]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.06 Freeway Ramps|6.05.06 Freeway Ramps]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.07 Relocating Traffic|6.05.07 Relocating Traffic]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#A. Road Way|A. Road Way]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#B. Vertical and Horizontal Clearance|B. Vertical and Horizontal Clearance]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#C. Objects within the Clear Zone|C. Objects within the Clear Zone]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#D. Shoulder Conditions|D. Shoulder Conditions]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.08 Value Engineering Change Proposals (VECP)|6.05.08 Value Engineering Change Proposals (VECP)]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles|6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.10 Temporary Median Crossovers|6.05.10 Temporary Median Crossovers]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.11 Traffic Control – Setup, Removal, and Stage Changes|6.05.11 Traffic Control – Setup, Removal, and Stage Changes]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#A. Traffic Switch|A. Traffic Switch]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#B. Advance Warning of Traffic Switch Operations|B. Advance Warning of Traffic Switch Operations]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#C. Law Enforcement During Traffic Switch Operations|C. Law Enforcement During Traffic Switch Operations]]
 +
** [[Work Zone - 6.05 Geometric Design & Safety#6.05.12 Nighttime Traffic Switches|6.05.12 Nighttime Traffic Switches]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#A. Nighttime Lighting for Traffic Switch Operations|A. Nighttime Lighting for Traffic Switch Operations]]
 +
*** [[Work Zone - 6.05 Geometric Design & Safety#B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations|B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations]]
 +
 
 +
* [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology|6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.01 Permanent Systems (Cameras, Detectors, Signs)|6.06.01 Permanent Systems (Cameras, Detectors, Signs)]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.02 Temporary Portable Cameras|6.06.02 Temporary Portable Cameras]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.03 Variable Speed Limits|6.06.03 Variable Speed Limits]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.04 Stopped Traffic Advisory System|6.06.04 Stopped Traffic Advisory System]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.05 Dynamic Lane Merge Systems (Early/Late Merge)|6.06.05 Dynamic Lane Merge Systems (Early/Late Merge)]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.06 Highway Advisory Radio (HAR)|6.06.06 Highway Advisory Radio (HAR)]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.07 Portable Traffic Detectors/Sensors|6.06.07 Portable Traffic Detectors/Sensors]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.08 Ramp Metering|6.06.08 Ramp Metering]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.09 Information Response Systems|6.06.09 Information Response Systems]]
 +
*** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#A. Trucks Entering, Crossing, and Exiting|A. Trucks Entering, Crossing, and Exiting]]
 +
*** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#B. Temporary Speed Radar Trailers|B. Temporary Speed Radar Trailers]]
 +
*** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#C. Work Space Intrusion|C. Work Space Intrusion]]
 +
*** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#D. Oversize Vehicle|D. Oversize Vehicle]]
 +
** [[Work Zone - 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology#6.06.10 Additional ITS Resources|6.06.10 Additional ITS Resources]]

Latest revision as of 13:19, 27 September 2022

Chapter 6: Traffic Control Devices and Implementation