(Added content) |
(Added links) |
||
| Line 8: | Line 8: | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.06 Barricades|6.01.06 Barricades]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.06 Barricades|6.01.06 Barricades]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.07 Temporary Barriers|6.01.07 Temporary Barriers]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.07 Temporary Barriers|6.01.07 Temporary Barriers]] | ||
| − | *** A. Movable Barriers | + | *** [[Work Zone - 6.01 Temporary Traffic Control# A. Movable Barriers|A. Movable Barriers]] |
| − | *** B. Mobile Barrier Walls | + | *** [[Work Zone - 6.01 Temporary Traffic Control#B. Mobile Barrier Walls|B. Mobile Barrier Walls]] |
| − | *** C. Water Filled Barrier | + | *** [[Work Zone - 6.01 Temporary Traffic Control#C. Water Filled Barrier|C. Water Filled Barrier]] |
| − | *** D. Barrier Endings (attenuation) | + | *** [[Work Zone - 6.01 Temporary Traffic Control#D. Barrier Endings (attenuation)|D. Barrier Endings (attenuation)]] |
| − | *** E. Mobile Attenuators | + | *** [[Work Zone - 6.01 Temporary Traffic Control#E. Mobile Attenuators|E. Mobile Attenuators]] |
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.08 Temporary Signs|6.01.08 Temporary Signs]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.08 Temporary Signs|6.01.08 Temporary Signs]] | ||
| − | *** A. Ground-Driven Temporary Signing | + | *** [[Work Zone - 6.01 Temporary Traffic Control#A. Ground -Driven Temporary Signing|A. Ground-Driven Temporary Signing]] |
| − | *** B. Portable Temporary Signing | + | *** [[Work Zone - 6.01 Temporary Traffic Control#B. Portable Temporary Signing|B. Portable Temporary Signing]] |
| − | *** C. Portable Temporary Signing – Roll-up | + | *** [[Work Zone - 6.01 Temporary Traffic Control#C. Portable Temporary Signing – Roll-up|C. Portable Temporary Signing – Roll-up]] |
| − | *** D. Innovative Temporary Signing | + | *** [[Work Zone - 6.01 Temporary Traffic Control#D. Innovative Temporary Signing|D. Innovative Temporary Signing]] |
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.09 Sign Covers|6.01.09 Sign Covers]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.09 Sign Covers|6.01.09 Sign Covers]] | ||
| − | *** A. Directional Guide Signs | + | *** [[Work Zone - 6.01 Temporary Traffic Control#A. Directional Guide Signs|A. Directional Guide Signs]] |
| − | *** B. Overhead Signs | + | *** [[Work Zone - 6.01 Temporary Traffic Control#B. Overhead Signs|B. Overhead Signs]] |
| − | *** C. Regulatory Signs | + | *** [[Work Zone - 6.01 Temporary Traffic Control#C. Regulatory Signs|C. Regulatory Signs]] |
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.10 Signing Coordination|6.01.10 Signing Coordination]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.10 Signing Coordination|6.01.10 Signing Coordination]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.11 Project Specific Signing|6.01.11 Project Specific Signing]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.11 Project Specific Signing|6.01.11 Project Specific Signing]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.12 Temporary Pavement Markings|6.01.12 Temporary Pavement Markings]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.12 Temporary Pavement Markings|6.01.12 Temporary Pavement Markings]] | ||
| − | *** A. Pavement Marking Removal | + | *** [[Work Zone - 6.01 Temporary Traffic Control#A. Pavement Marking Removal|A. Pavement Marking Removal]] |
| − | *** B. Shift Markings | + | *** [[Work Zone - 6.01 Temporary Traffic Control#B. Shift Markings|B. Shift Markings]] |
| − | *** C. Temporary Raised Pavement Markers (TRPM), Type 3 | + | *** [[Work Zone - 6.01 Temporary Traffic Control#C. Temporary Raised Pavement Markers (TRPM), Type 3|C. Temporary Raised Pavement Markers (TRPM), Type 3]] |
| − | *** D. Pavement Marking Cover | + | *** [[Work Zone - 6.01 Temporary Traffic Control#D. Pavement Marking Cover|D. Pavement Marking Cover]] |
| − | *** E. Curing Compound Removal | + | *** [[Work Zone - 6.01 Temporary Traffic Control#E. Curing Compound Removal|E. Curing Compound Removal]] |
| − | *** F. Edge Line Markings | + | *** [[Work Zone - 6.01 Temporary Traffic Control#F. Edge Line Markings|F. Edge Line Markings]] |
| − | *** G. Capital Preventive Maintenance (CPM) Projects | + | *** [[Work Zone - 6.01 Temporary Traffic Control#G. Capital Preventive Maintenance (CPM) Projects|G. Capital Preventive Maintenance (CPM) Projects]] |
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.13 Lighting|6.01.13 Lighting]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.13 Lighting|6.01.13 Lighting]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.14 Arrow Boards|6.01.14 Arrow Boards]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.14 Arrow Boards|6.01.14 Arrow Boards]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.15 Portable Changeable Message Sign (PCMS)|6.01.15 Portable Changeable Message Sign]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.15 Portable Changeable Message Sign (PCMS)|6.01.15 Portable Changeable Message Sign]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.16 Temporary Traffic Signals|6.01.16 Temporary Traffic Signals]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.16 Temporary Traffic Signals|6.01.16 Temporary Traffic Signals]] | ||
| − | *** A. Temporary Mounted Signal System | + | *** [[Work Zone - 6.01 Temporary Traffic Control#A. Temporary Mounted Signal System|A. Temporary Mounted Signal System]] |
| − | *** B. Temporary Portable Signal System | + | *** [[Work Zone - 6.01 Temporary Traffic Control#B. Temporary Portable Signal System|B. Temporary Portable Signal System]] |
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.17 Automated Flagger Assistance Device (AFAD)|6.01.17 Automated Flagger Assistance Device (AFAD)]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.17 Automated Flagger Assistance Device (AFAD)|6.01.17 Automated Flagger Assistance Device (AFAD)]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.18 Glare Screening|6.01.18 Glare Screening]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.18 Glare Screening|6.01.18 Glare Screening]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.19 Transverse Temporary Rumble Strips|6.01.19 Transverse Temporary Rumble Strips]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.19 Transverse Temporary Rumble Strips|6.01.19 Transverse Temporary Rumble Strips]] | ||
| − | *** A. Fixed Temporary Transverse Rumble Strips – Freeway | + | *** [[Work Zone - 6.01 Temporary Traffic Control#A. Fixed Temporary Transverse Rumble Strips – Freeway|A. Fixed Temporary Transverse Rumble Strips – Freeway]] |
| − | *** B. Fixed Temporary Transverse Rumble Strips – Non-Freeway | + | *** [[Work Zone - 6.01 Temporary Traffic Control#B. Fixed Temporary Transverse Rumble Strips – Non-Freeway|B. Fixed Temporary Transverse Rumble Strips – Non-Freeway]] |
| − | *** C. Portable Temporary Transverse Rumble Strips – Non-Freeway | + | *** [[Work Zone - 6.01 Temporary Traffic Control#C. Portable Temporary Transverse Rumble Strips – Non-Freeway|C. Portable Temporary Transverse Rumble Strips – Non-Freeway]] |
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.20 Existing Longitudinal Rumble Strips|6.01.20 Existing Longitudinal Rumble Strips]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.20 Existing Longitudinal Rumble Strips|6.01.20 Existing Longitudinal Rumble Strips]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.21 Pilot Vehicles|6.01.21 Pilot Vehicles]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.21 Pilot Vehicles|6.01.21 Pilot Vehicles]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.22 Innovative Traffic Control Devices|6.01.22 Innovative Traffic Control Devices]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.22 Innovative Traffic Control Devices|6.01.22 Innovative Traffic Control Devices]] | ||
** [[Work Zone - 6.01 Temporary Traffic Control#6.01.23 Rolling Roadblocks|6.01.23 Rolling Roadblocks]] | ** [[Work Zone - 6.01 Temporary Traffic Control#6.01.23 Rolling Roadblocks|6.01.23 Rolling Roadblocks]] | ||
| − | *** A. Work Activities | + | *** [[Work Zone - 6.01 Temporary Traffic Control#A. Work Activities|A. Work Activities]] |
| − | *** B. Construction | + | *** [[Work Zone - 6.01 Temporary Traffic Control#B. Construction|B. Construction]] |
| − | *** C. Operations Plan | + | *** [[Work Zone - 6.01 Temporary Traffic Control#C. Operations Plan|C. Operations Plan]] |
* [[Work Zone - 6.02 Speed Limits in Work Zones|6.02 Speed Limits in Work Zones]] | * [[Work Zone - 6.02 Speed Limits in Work Zones|6.02 Speed Limits in Work Zones]] | ||
Revision as of 14:59, 26 September 2022
Chapter 6: Traffic Control Devices and Implementation
- 6.01 Temporary Traffic Control
- 6.01.01 Cones
- 6.01.02 Plastic Drums
- 6.01.03 42-Inch Channelizing Devices
- 6.01.04 Tubular Markers
- 6.01.05 Delineators
- 6.01.06 Barricades
- 6.01.07 Temporary Barriers
- 6.01.08 Temporary Signs
- 6.01.09 Sign Covers
- 6.01.10 Signing Coordination
- 6.01.11 Project Specific Signing
- 6.01.12 Temporary Pavement Markings
- 6.01.13 Lighting
- 6.01.14 Arrow Boards
- 6.01.15 Portable Changeable Message Sign
- 6.01.16 Temporary Traffic Signals
- 6.01.17 Automated Flagger Assistance Device (AFAD)
- 6.01.18 Glare Screening
- 6.01.19 Transverse Temporary Rumble Strips
- 6.01.20 Existing Longitudinal Rumble Strips
- 6.01.21 Pilot Vehicles
- 6.01.22 Innovative Traffic Control Devices
- 6.01.23 Rolling Roadblocks
- 6.03 Quality Guidelines
- 6.03.01 Channelizing Device Quality Process
- A. Process
- 6.03.01 Channelizing Device Quality Process
- 6.04 Detours & Alternate Routes
- 6.04.01 Full Road Closures
- 6.04.02 Directional Detours
- 6.04.03 Ramp Closures
- 6.04.04 Detour Signing
- A. Sign Color and Sizes
- B. End Detour
- C. Portable Changeable Message Signs (PCMS)
- 6.05 Geometric Design & Safety
- 6.05.01 Lane Transitions and Widths
- 6.05.02 Shy Distance and Buffer Zones
- 6.05.03 Work Zone Clear Zone
- 6.05.04 Vertical Under Clearance
- 6.05.05 Lane Edge
- 6.05.06 Freeway Ramps
- 6.05.07 Relocating Traffic
- A. Road Way
- B. Vertical and Horizontal Clearance
- C. Objects within the Clear Zone
- D. Shoulder Conditions
- 6.05.08 Value Engineering Change Proposals (VECP)
- 6.05.09 Transport Permits for Oversize (Weight, Width, Height, & Length) Vehicles
- 6.05.10 Temporary Median Crossovers
- 6.05.11 Traffic Control – Setup, Removal, and Stage Changes
- A. Traffic Switch
- B. Advance Warning of Traffic Switch Operations
- C. Law Enforcement During Traffic Switch Operations
- 6.05.12 Nighttime Traffic Switches
- A. Nighttime Lighting for Traffic Switch Operations
- B. Lane Rental or Liquidated Damage Assessments during Traffic Switch Operations
- 6.06 Work Zones, Intelligent Transportation Systems (ITS), and Technology
- 6.06.01 Permanent Systems (Cameras, Detectors, Signs)
- 6.06.02 Temporary Portable Cameras
- 6.06.03 Variable Speed Limits
- 6.06.04 Stopped Traffic Advisory System
- 6.06.05 Dynamic Lane Merge Systems (Early/Late Merge)
- 6.06.06 Highway Advisory Radio (HAR)
- 6.06.07 Portable Traffic Detectors/Sensors
- 6.06.08 Ramp Metering
- 6.06.09 Information Response Systems
- A. Trucks Entering, Crossing, and Exiting
- B. Temporary Speed Radar Trailers
- C. Work Space Intrusion
- D. Oversize Vehicle
- 6.06.10 Additional ITS Resources